Jump to content

Thinkingallowed

Member
  • Posts

    5
  • Joined

  • Last visited

Posts posted by Thinkingallowed

  1. 35 minutes ago, newnative said:

         It's not always just a few baht.  We had to put 15,000 baht down as a deposit on our current meter--don't ask me why the deposit isn't the same for all condos and why this particular condo project was at the very top of what they require for a deposit.  Some of our deposits were 2000 baht and one was 6000 baht--for condos from 1 to 3 bedrooms.  

    Electric meter deposit determined as follows:

    5 amp single phase (2 wires) = THB 300

    15 amp single phase (2 wires) = THB 2,000

    30 amp single phase (2 wires) = THB 5,000

    15 amp three phase (4 wires) = THB 6,000

    30 amp three phase (4 wires) = THB 15,000

    • Like 2
×
×
  • Create New...