Jump to content

carlyai

Advanced Member
  • Posts

    5,655
  • Joined

  • Last visited

Everything posted by carlyai

  1. Thank you. It would seem the pressure is about 2 psi then. It's definitely not exactly blasting out, but hopefully enough to get up to the tank and fill it. Thanks again.
  2. My 0.5 HP submersible is pumping fine, but I can't see a pressure meter reading on my guage. It doesn't move of zero. I think I read the pressure should be about 20 psi. I know there is water pressure there because I installed a 3 m pipe vertically and the water flow out the end was fine (to eventually connect to fill out tank). I know I'm missing something basic but I can't see it. Sorry pics stuffed up.
  3. I have a non-DIN rail component plastic box that I want to mount on a DIN rail. So I'm looking for the female type connectors to mount on my electronic plastic box to fit to the male DIN rail. I see these on LAZADA but not sure they are correct for what I want. Just don't look right. Anyone experienced with these or component DIN rail connectors?
  4. So we don't have the same problem England, Europe and the USA have. Also to stop all these boat people dying at sea. We're not silly you know. ????
  5. We have 3 phase to the house. The meter was moved from the rice thrasher machine for us to use. So for a monthly total of 582 units we pay B2569.84. There is also this on the bill Ft 0.0139 8.09. So we pay B4.41/unit I think. Are we paying a factory rate? I've been away for nearly a year and my lovely wife has been driven mader with this monthly bill and turned off and pulled out all sorts of electrical stuff (bless her little heart), so I've go to reduce the bill or turn off more of my things. Solar coming for one phase, but if we are being classed as a factory because of the 3 phase, maybe I can get this classification changed. Most important to keep SWMBO happy as we all know. ????
×
×
  • Create New...