because of the size of the CU (3 boxes) I was thinking to go from one RCD to the next, so most RCDs will have 2 N´s and 2 L´s connected on the top of the RCD (is that called parallel?)
I could make a main N-bar and a L-bar for each phase, but because the size of the CU I thought that might get a bit messy
that sounds like a good idea!
I have no experience with both of them, I will look in to that.
Yes, I do plan on adding a solar system. Not sure yet on the details. Once I have my CU sorted out I will read the solar forum on here!
We are in Bangkok, so I reckon a generator won´t be necessary.
Actually, that´s what I wanted to do, but reading through some forums discussing ¨selectivity¨ kind of put me off. Again, I´m probably overthinking things.
Please advise me on this;
If I want to place a second CU upstairs (approx. 15m from the main CU)
I assume I need to bring all 3 phases?
What size of cable do I need?
How to secure the 2nd CU in the main CU? With a MCB? Or can I just bring 3L+N straight after the main switch?
Does my 2nd CU need a main switch rated lower than the main switch in the 1rst CU?
Can the RCDs in the 2nd CU have the same rating as the RCDs in the main CU?
How many sub CUs can a system have? When does ´selectivity´ comes in?
It will indeed safe me quite a lot on cables and will make the overall installation easier!