SlyouThai Posted September 17, 2020 Share Posted September 17, 2020 (edited) Hello everyone ! Need some advices for a job. We had problems with bad plumbing and i had to remove the floor of bathroom , then i decided to remove everything and renovate all. Here is how it looks now , we removed the tiles and you can see the old rendering . From there can i use https://www.th.weber/en/weberdry-2k-flex wich can me mixed with different ratio for rendering or roller. Idea is to first adjust with a thin render of the wall ( i dont want to loose more space its small ) to have a flat and " clean " surface , then after that we use the same product but to roll 2 times the product for waterproofing . In the video on the official page they do not use waterproofing tapes in corners and im not sure why and if i should use it. Or maybe its easier to do thin rendering with weberdry 2K then go with a liquid membrane like MR fixit products ? Am i missing some important steps there ? Primer at some stages ? What about the floor can they just lay this product directly since we already have a slope ? Will add a picture of how hopefully it may look when done. SCG shop made a 3d rendering for free with some tiles they sell "wood tiles " for shower are obviously ceramic and antislippery. For the counter i will not use wood but something else or composite product. Edited September 17, 2020 by SlyouThai Link to comment Share on other sites More sharing options...
Yellowtail Posted September 17, 2020 Share Posted September 17, 2020 You're doing the render and tile work yourself? Link to comment Share on other sites More sharing options...
SlyouThai Posted September 17, 2020 Author Share Posted September 17, 2020 No im not , but i want to make sure of whats needed to be done so i can buy the correct products and ask for necessary steps Link to comment Share on other sites More sharing options...
Yellowtail Posted September 18, 2020 Share Posted September 18, 2020 Why not get a quote first, see what they recommend and go from there? The should provide a material list with the quote. That last thing you want is to hire a contractor and compel them to used a bunch of stuff they know dick-all about. 2 Link to comment Share on other sites More sharing options...
Popular Post richard_smith237 Posted September 18, 2020 Popular Post Share Posted September 18, 2020 When using contractors only go by first hand recommendations of someone you trust. We’ve just had a disaster by going with a company one of the condo juristic people recommended. We ended up running him (and his staff) off halfway through the job (kitchen extension). The roof people have been back 4 times to fix a leak !!! and they looked professional from the start. 95% of work carried out is substandard. Even when the company and lead guy looks professional, it all comes down to the quality of the actual labourers themselves, because unless every single step is watched like a hawk the idiocy and propensity to take a short is absolutely outstanding. 6 1 Link to comment Share on other sites More sharing options...
siam dreamers Posted September 18, 2020 Share Posted September 18, 2020 Hello I am in the process of tiling my first floor with wood plank tiles. I am using and can highly suggest a tile leveling system to prevent lippage fro the natural warp of long tiles. A kit to do the bathroom can be had from global for about 590 baht and work dream. It is a bit of a pain and time consuming but in a small bath it may be worth it. 1 Link to comment Share on other sites More sharing options...
fredob43 Posted September 18, 2020 Share Posted September 18, 2020 (edited) You will more than likely find they will Tile using cement they all seem to do it that way here. They will mix a water proof liquid (bit like water) in with the cement to stop any leaks. But you will have to keep an eye on them just in case. Have just had one of my on-suite wet rooms sorted the tiling was done by the Boss and must say he did a good job. Then he left it to his workman who ended up putting the system in back to front. Soon fixed once pointed out. I just wanted the piping put on the surface I have had to many problems with leaks in the past. But if you are going to have the pipes put into the walls make sure they pressure test it all before Tiling. Just had another look at your picture what the Buddha is that concrete blocking. Did it used to be a water butt??? whatever tell them get rid of anything like that and let them tile as said with cement they will get their levels correct if they know what they are doing. Edited September 18, 2020 by fredob43 1 1 Link to comment Share on other sites More sharing options...
Yellowtail Posted September 18, 2020 Share Posted September 18, 2020 21 minutes ago, fredob43 said: You will more than likely find they will Tile using cement they all seem to do it that way here. They will mix a water proof liquid (bit like water) in with the cement to stop any leaks. But you will have to keep an eye on them just in case. Have just had one of my on-suite wet rooms sorted the tiling was done by the Boss and must say he did a good job. Then he left it to his workman who ended up putting the system in back to front. Soon fixed once pointed out. I just wanted the piping put on the surface I have had to many problems with leaks in the past. But if you are going to have the pipes put into the walls make sure they pressure test it all before Tiling. Next time pick the tile yourself... 1 1 Link to comment Share on other sites More sharing options...
fredob43 Posted September 18, 2020 Share Posted September 18, 2020 (edited) 17 minutes ago, Yellowtail said: Next time pick the tile yourself... I wanted a cheap job just wanted/requested non slip on the floor. I have 5 double bed rooms all on-Suite by the time all are done it would work out a fortune for something I will never personally use. My own one is granite. But that can be a problem as Granite is very slippery when wet. Looks nice though. Practical and cheap is what I go for now. What do you want it isn't even my own place it's in the wife's name. Edited September 18, 2020 by fredob43 1 Link to comment Share on other sites More sharing options...
Crossy Posted September 21, 2020 Share Posted September 21, 2020 On 9/18/2020 at 8:33 PM, fredob43 said: Just had another look at your picture what the Buddha is that concrete blocking. Did it used to be a water butt??? whatever tell them get rid of anything like that and let them tile as said with cement they will get their levels correct if they know what they are doing. Says the man whose toilet cistern is on backwards ???? Fetching my coat. 1 Link to comment Share on other sites More sharing options...
fredob43 Posted September 21, 2020 Share Posted September 21, 2020 2 hours ago, Crossy said: Says the man whose toilet cistern is on backwards ???? Fetching my coat. If you had read my previous comment you would know why. 1 Link to comment Share on other sites More sharing options...
Yellowtail Posted September 21, 2020 Share Posted September 21, 2020 20 minutes ago, fredob43 said: If you had read my previous comment you would know why. Because you wanted a cheap job? Or because it's not installed, it's just waiting in a corner waiting for the cheap labor to install it? Link to comment Share on other sites More sharing options...
Crossy Posted September 21, 2020 Share Posted September 21, 2020 4 minutes ago, Yellowtail said: Or because it's not installed, it's just waiting in a corner waiting for the cheap labor to install it? It seems that the cheap labour actually installed it ike that ???? Link to comment Share on other sites More sharing options...
Yellowtail Posted September 21, 2020 Share Posted September 21, 2020 1 minute ago, Crossy said: It seems that the cheap labour actually installed it ike that ???? Well, they must still be in there, as it doesn't look like that door will open... 1 1 Link to comment Share on other sites More sharing options...
fredob43 Posted September 21, 2020 Share Posted September 21, 2020 (edited) 12 minutes ago, Yellowtail said: Because you wanted a cheap job? Or because it's not installed, it's just waiting in a corner waiting for the cheap labor to install it? Please read my first post I did try and explain what had happened. The Boss did the tiling fitted the toilet base. then told one of his labours to fit the system. And he put it on back to front. Not a problem as nothing had been plumbed in, just the two fixing screws done up. I spotted it at once and we all had a laugh. Edited September 21, 2020 by Crossy flame removed Link to comment Share on other sites More sharing options...
Yellowtail Posted September 21, 2020 Share Posted September 21, 2020 14 minutes ago, fredob43 said: Please read my first post I did try and explain what had happened. The Boss did the tiling fitted the toilet base. then told one of his labours to fit the system. And he put it on back to front. Not a problem as nothing had been plumbed in, just the two fixing screws done up. I spotted it at once and we all had a laugh. I'm calling BS. 1 Link to comment Share on other sites More sharing options...
fredob43 Posted September 21, 2020 Share Posted September 21, 2020 (edited) 54 minutes ago, Yellowtail said: Because you wanted a cheap job? Please allow me to tell the full story. Was having work done on the house. They had fitted a new side roof, and repainted anything that didn't move inside and out + lots of other bits. At the eleventh hour I decided while they were here I would have one of my spare bedrooms sorted. They put a new ceiling/electric in and changed two double windows. So decided I would have the on-suite sorted as well. The total without the on-suite was just over 180k bht that's why I wanted a cheap job. Not that cheap as it turned out, as that ended up at around another 20k+ as well, by the time I added on the new toilet, basin taps, and shower. Still not finished as I have to get a new Aircon 19k??? and double bed & curtains +++ Whatever around a 1/4 of a Mil; should see it done. Happy now. Edited September 21, 2020 by fredob43 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now