Jump to content

steve187

Advanced Member
  • Posts

    7,754
  • Joined

  • Last visited

Posts posted by steve187

  1. On 1/1/2024 at 1:39 PM, xylophone said:

    No I didn't miss the description of the department he heads, and one of the reasons why it's called "Slow Horses". All the same it is a government department which he heads up and although he may not care about the Department, surely he has to care about his personal hygiene??

     

    No point in going on about this because it's purely my personal viewpoint and in all of the other many detective series/police series/adventure series I have seen, no one has been this ridiculously filthy.
     

    don't forget 'slow horses' does not exist, its fiction, someone made it all up to sell a book i expect.

    • Agree 2
  2. 9 hours ago, surreybloke said:

    Can it really be true ?   I love isaan and Korat.   The downside is getting there.  Train is slow and driving is just horrible. I drive up route 2 and feel I need valium afterwards.   Aggressive does not really describe driving standards.   Is the motorway just a racetrack best left alone or will mean those of us who prefer a leisurely  drive be able to use the regular road underneath and enjoy more relaxed experience.  Then there is still the climb up past the cement works   .  

    are you saying the motorway is open end to end,

    I doubt it will be more relaxed underneath

  3. PV system fitted yesterday 9 x 570w longi panels. 5kw maxsky hybrid inverter 49v 245ah nmc battery, 6 of the panels had been fitted on a previous visit, nice tidy job, system working well today ( thursday) 13.10kwh production, started producing at 7.40am stopped at 5.40pm, battery full by midday, production peaked at 4.13kwh at 10.30am, we had used the battery the previous evening and all night. so 0 units on the meter since install completed at 7pm on wednesday

    the installer from Bangkok, system fitted close to Ban chang rayong, would recommend the fitter, he spoke ok English well enough to explain system to me, will add some photo's later

    • Thumbs Up 1
    • Thanks 1
  4. 46 minutes ago, norbra said:

    Be prepared re your next AIS marathon sim, I think it will have a. 70gb cap

    Screenshot_20231223_132515.jpg

    my yearly AIS net marathon 15mbps/100gb per month sim run out this week, was looking at options, and was informed top up sim for 1,800thb and it will be renewed on the same package for another year, was automatically renewed after top up, my 15mbps/100gb per month sim is not available anymore, i think for new customers its 2,200thb for 15mbps/50gb

    • Thumbs Up 1
  5. On 12/14/2023 at 3:04 AM, still kicking said:

    Go out more? Just came back from a holiday in Ratchaburi I have not seen a single house with solar, yes maybe because you are a Farang you designed your house for solar. Normal Thai houses don't have solar. But as you know they be better off. I am not complaining but the government should help to install one.

    i am in the throws of having a system installed, going to be 9x 570 longi panels, 5kw deye hybrid inverter with a 11kw battery 48v 248ah, the installer from Bangkok is busy all the time, i had to wait a month for him to fit me in, he found some time for his men to come and fit the panels, so he is coming next week to complete the install, system will not be seen from street level

    • Like 1
    • Love It 1
  6. 3 hours ago, Ravi98008 said:

    I am sorry I might have posted wrong years. Current retirement Visa extension stamp expires April 2024.  USA passport expires march 6 2025.   May I please ask you if I can get another retirement Visa extension stamp from April 16 2024 through March 6th 2025. Because my passport USA expires on march 6 th 2025

    yes you can, then renew passport november/december 2024

    • Love It 1
  7. 4 hours ago, Crossy said:

    Check the actual specs.

     

    But yes, the Huawei units use high-voltage packs that are specific to Huawei, no second source. So, they can charge what they like :sad:

     

    Deye use more common 48V packs with many sources.

     

     

    the fitter called round today to drop off the panels, now going for Deye inverter with a 48v 240ah battery set up.

  8. i am thinking of having a solar system installed at first without batteries, but with the intension of adding later, the inverters that the chap uses are either a Huawei sun 2000 3KTL L1 or a Deye Lvtosun 5kw, i seem to recall reading somewhere that Huawei inverters only allow expensive Huawei batteries to be used, if so if i chose the Deye inverter instead could cheaper battery solutions be used. 

×
×
  • Create New...