Jump to content

tuk75

Member
  • Posts

    35
  • Joined

  • Last visited

Profile Information

  • Location
    Rayong

Previous Fields

  • Location
    Rayong

Recent Profile Visitors

2,146 profile views

tuk75's Achievements

Apprentice Member

Apprentice Member (3/14)

  • Conversation Starter
  • 10 Posts
  • First Post
  • 5 Reactions Given
  • Dedicated Rare

Recent Badges

13

Reputation

  1. You find the form in english online, usually after 15th march.
  2. I have my pink id as TIN number, registered for a lot of years ago.
  3. First etap is home. NocNoc did deliver my 5 pcs JA 550W panels for 14.000 bath today. Next will be the inverter, probably Growatt from Alibaba for 17.000 bath delivered. Some break just now, my daughter from Europe wants to visit me for second time this year, but I will update when something happens. T.
  4. Lazada, Shopee, Google is your friend
  5. As BrittManToo suggest why not separate inverters, The only problem is that Sofar is not hybrid. It’s a pity not to use the Sofar. I am thinking of using Sofar as the last inverter for daytime use with no export on. Connecting a Hybrid inverter to the same phase primarily to charge batteries or to export and to power up the house nighttime. In my mind it should work but please give your opinion. My 6000 W water heater I anyhow connect to a separate phase. With two separate inverters it would give me a bigger choice of inverters.
  6. I am very happy with my "Cheap Charlie" investment for 2 years ago. Deye inventers sounds little bit expensive but I will look as well as Growatt. I have a 3 phase supply, but I am using it like a 1 phase. I am only using excess money from my pension, not touching my savings. Investments goes on my budgett, but the electric bill is on wifes budgett. I will update when I have bought some new inverters or panels. Thanks. T.
  7. Hi guys, Need some expert help to my solar installation. What I have today is 9 x 380 W and a Sofar 3.2 inventer. Panels are east-south direction, max production 17-19 KwH per day, ROI about 2 years. I have a roof south-west direction with place of 5 panels 550 W or maybe 620 W. I have in mind a Anern 10.2 or PowMr 10.2 inverter with 2 MPPTs , but I am concern if the MPPTs will work with different volts and amps without problems. The alternative is 2 parallel inverters but it’s difficult to find 5 KwH hybrid inverters for a acceptable price. The plan is to get batteries after a while, to be completely independent of PEA. Thanks in advance T.
  8. I need to send the tax return every year just to get it on the paper, have some Norwegian pensions that require a copy.
  9. I am tax resident and the revenue dept sends tax return (91) automatically every year.
  10. Dont matter, your reentry is valid as long as your permit to stay.
  11. Book an appointment online for document legalization work. ONLINE RESERVATION FOR LEGALIZATION SERVICE Book an appointment online Online Reservation Check the queue Queue Check If you did not receive your reservation detail, Click here to resend it to your email. click here to resend it to your email. If you have any problems, please contact. Number 091-723-3604 During business hours, Monday - Friday , 9:00 a.m. - 12:00 p.m. and 1:00 p.m. - 3:00 p.m. Kindly reserve only once per week per person. If you have urgency or inquiries, please contact Tel. 091-723-3604 9 - 12 hrs. and 13 - 15 hrs. consular.mfa.go.th Department of Consular Affairs, Ministry of Foreign Affairs (DEPARTMENT OF CONSULAR AFFAIRS)
  12. You can do it in CW by mail, 400 bath or at Foregn dept office in Pattaya. (Central) Lok at Foreign departments homepage or at Facebook. Only they do its to validate the Consuls signature to avoid fakes.

×
×
  • Create New...