We've had a new electric meter installed. Previously, we had a spinning disc meter with our ongrid solar system.
Would like to know if it's ok to run our currently turned off ongrid inverter. Obviously we don't want to be double charged for electric or blow the meter up.
-
1 hour ago, Bandersnatch said:
Like yourself I have 2 electric cars, prior to getting my second I was producing more power than I could use and as my hybrid off-grid inverters could not export so power was being curtailed.
Now I am finding that I run my house batteries down sometimes so I plan to do a system tweek that I will post about later. My BYD Seal has V2L so I am using it as backup power via my inverter.
I have 3 Growatt SPF 5000 ES inverters. My original solar system is a stand alone backup system which now redundant due to the V2L. I plan to give my old inverter to a mate and buy a 4th Growatt, that will give more peak load power.
Been following your build and would be great to be totally off grid.
One thing I read about off grid builds is they need alot of power management unless you really over size. Just my impression
- 1
-
9 hours ago, JBChiangRai said:
I wouldn't change to a Hybrid inverter. Does your Souer inverter have a CT coil to place around a wire to prevent feedback to the grid?
If not i would look for a 3kw Grid-Tied inverter with CT coil. My friends and I between us have installed 8 of MUST inverters and they work great. With a 3Kw inverter you could add another 3 solar panels.
Post the Voc of your panels and Vmax of your inverter for more detailed advice.
cheers I think I will go with this as I really don't want to go buying batteries
- 1
-
Thanks to the members here I've had a small solar set up running for the last year.
I have two systems. Each system consists of 3 of 340w panels wired parallel to an on grid souer inverter.
Now the spinning disc meter is to be changed to a digital meter off his week.
I understand I need to change to a hybrid inverter but certainly don't want to export any electric back into the grid. Also I don't want to start buying batteries.
I do have 2 electric cars that maybe I could change any excess energy.
I looked at Lazada but need a little help in choosing an inverter.
Also any recommendations should I change my setup. I have space for may another 3 solar panels.
Thanks
-
Thanks to the contributions here I managed to install a gti system last January and been running great.
I have 3 330w panels wired in parallel to a cheap 1000w inverter. I have two of these setups.
These are wired to the house consumer unit.
I just seen on facebook that our area “udon Thani” have started to replace the disc meter to digital.
The question I have is can I install a no export limit. My inverters have no option to fit this.
Maybe just keep the setup as is and look at a longer payback period.
or look into a hybrid inverter
looking for suggestions really
-
- Popular Post
You need to confirm pea will fit the tou meter first. Then you need to install the wiring from where the new meter will be to where you will be charging the car. The new wiring needs to be to spec.
Afterwards pea need to install the meter. Then MG contractor will come and install the charger.
- 1
- 2
-
Many thanks for the replies. I like the idea of drilling the panel and making a solid fixing. But was concerned about panel expansion or is this not a problem
-
I'm near to ordering all the items for my small solar system.
One question is I'm DIY ING the panel mounting and wonder can you drill into the side of a panel for my fixings
-
- Popular Post
- Popular Post
Ordered a Neta a couple weeks ago. Told delivery April. B5000 deposit. Nice looking car. Had a test drive around town. Rear view was restricted and seat was a little firm. But will be using it as a town car only.
- 1
- 2
-
Try fish tape cable puller
-
- Popular Post
- Popular Post
42 minutes ago, Gweiloman said:Did you have to pay for the 2nd meter and if so, how much? Also, how long did it take PEA to install it?
2nd meter about B4500 three weeks to fit from order. Udon Thani office
- 3
-
4 hours ago, Crossy said:
No problem with grounding, all your grounds are referenced to the common neutral in a TNC-S system.
Oddly enough I was thinking along exactly those lines. One could adapt the ESP8266 internet timer that I'm using to control the export system on our solar to operate the transfer switch. Give it a calendar file as well and it could set up for holidays as well as weekends.
So could I use a single pole transfer switch for the live wire to the air conditioning. Or is it best to try to locate and switch the neutral too...
- 1
-
1 hour ago, MJCM said:
That s........ ????
Question please.
Do you now have 2 Electricity Meters?
Meter 1 normal Disc Meter for the House
Meter 2 a Digital Meter for the TOU / EV?
Yes, 2 meters. Old disc one for the house. New digital one for the EV
- 2
-
We have a MG EV car.
To charge this at home we have a dedicated electric meter and consumer unit where the charger is fed from .
The meter is a Tou meter.
We have several spare ways on the consumer unit and was thinking we could move the washing machine from our house electric supply to the EV charger supply.
Will this be ok or will it impact in charging the EV.
-
Thanks for the replies.
Another question, we have a separate meter for charging the car. Using the pea Tou meter The consumer unit also has several spare MCBs. Could we plug our washing machine into this and take advantage of the Tou rate. Also would this be detrimental to the car if using both at the same time ...
-
On 11/28/2022 at 6:25 PM, Bandersnatch said:
Latest video from my channel: How to make a dumb EV charger a bit smarter
I also would like to do this. How do you get around the RFID card. The MG app on our EV plus dose not work.
-
Just a quick update. Meter and charger fitted and sort of working. Any ideas how to turn the MG charger off...... turning on I use the card and works fine.
-
- Popular Post
- Popular Post
Just now, Crossy said:A bit of both.
MG won't install their 7kW charger unless you have either: -
An existing 30/100 supply.
or
A separate 15/45 solely for the EV charger.
PEA were offering a second supply with the option of ToU (Time of Use) metering for cheaper off-peak charging, not sure if that offer still stands.
Yep tou was the meter ordered. In addition will be installing solar in the near future and maybe do some exporting
- 3
-
28 minutes ago, MJCM said:
Any news on this?
Yes
We can have a separate meter just for the car. Have visited pea and paid 4500 baht and we are on the list to have the meter installed.
The wire from the meter, outside in the lamppost to the new consumer unit in the carport has been installed. Cost2000 labour 7000 materials. MG have been surveyed the site and approved. Just call them when I want them to fix the charger to the wall. What else MG are going to do I'm not sure.
Obviously tit and the meter is not installed yet but so far so good.
Will update when operational.
Still can't get the MG app to work and have given up. Probably no use anyway.
- 1
- 1
-
33 minutes ago, MJCM said:
I have a question regarding this.
We inquired a while back at our local PEA for an additional PEA meter on the same property for my "Man cave". They said can but needs to have a House Number thus a House Book before they can install another meter. We could upgrade our current meter but not get a Separate meter. In the end we ditched the plan and location of the "Man Cave" is now part of the Wife's veggie garden ????
How is the OP solving this problem for his meter to charge the car??
Ouch. I just assumed we could get an extra meter. Will ask the wife to call PEA asap. Cheers
-
Ok, so have taken a delivery of an MG EV EP Plus.
A couple of questions. MG have an app called ismart. Can't get this to work, even downloaded the UK app, which doesn't work. Maybe this vehicle has no app function.
We are going to have an additional electric meter solely for charging the car. Will a 15/45 meter be ok..
Thanks for any help
-
Ok I downloaded the MG ismart app and it's all in Thai. Can I change this to English or is there another way. Thanks for all the help
-
The Mrs picked up our MG EP today and it came with a wire to charge at home. We are waiting for them to fit the fast charger.
Can I ask what app do you use for the car...thanks
-
Have you installed the MG home charger yet.
Our MG EP is ready but the Mrs says once we have got the car, only then can we organise the home charger and pea to come and install our tou meter.
Sounds like a few weeks wait and time to test the independent charging facilities