Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

SRT to expropriate land for high-speed rail links between airports

Featured Replies

SRT to expropriate land for high-speed rail links between airports

By The Nation

 

6a7fd901a982330b20e848616274da5e.jpeg

 

Privately owned land in Chachoengsao and Chon Buri is to be expropriated for the construction of stations for high-speed rail lines linking three airports, a senior State Railway of Thailand official said on Monday.


The rail lines linking to U-tapao, Suvarnabhumi and Don Mueang international airports are part of the Eastern Economic Corridor project.

 

Deputy SRT governor Jare Rungthanee said a study of appropriate routes found that, based on commuter convenience, it was preferable to build the stations in Chachoengsao and Chon Buri’s Siracha district on private rather than SRT property.

 

Jare said details of the expropriation await a more complete study, to be done this year.

 

SRT directors must then establish a committee to handle bidding on construction of the high-speed railway next year, he said.

 

Acting SRT governor Anon Luangboribun, an inspector with the Transport Ministry, said the SRT board recently earmarked an additional Bt300 million for land expropriation for the expansion of the Airport Rail Link line from Phayathai station to Don Mueang Airport.

 

Meanwhile the EEC development committee on Friday opened the door to private investment in two related projects – the high-speed lines linking the three airports, and a depot at U-tapao Airport, a Transport Ministry source said.

 

The source said the committee aimed to have contracts signed with private firms by the third quarter of next year.

 

The source said nearly 104,000 passengers a day were expected to use the City Line service of Airport Rail Link trains between Don Mueang and Suvarnabhumi, and 65,630 passengers a day will use the high-speed railway between Suvarnabhumi and Rayong.

 

The Don Mueang-Rayong commute would be two hours, with trains stopping at all stations along the route.

 

Source: http://www.nationmultimedia.com/detail/breakingnews/30329918

 
thenation_logo.jpg
-- © Copyright The Nation 2017-10-23
53 minutes ago, webfact said:

The Don Mueang-Rayong commute would be two hours, with trains stopping at all stations along the route.

 

So, not so much of a real high-speed link, more of a reasonable medium-speed link, then. 

 

It would still be good to see an interim-service trialled, using existing lines as far as possible, to test demand and introduce a cheaper/slower service meanwhile, until the medium-speed link is fully-constructed.

No doubt the connected would have purchased large tracts of this land already......and now for some well earned tax free gains!

5 minutes ago, ChrisY1 said:

No doubt the connected would have purchased large tracts of this land already......and now for some well earned tax free gains!

Similar to the hwy 7 extension to ban chang...most everything bought up well in advance and prices have now skyrocketed...

opening in 2050?

 

1 hour ago, ChrisY1 said:

No doubt the connected would have purchased large tracts of this land already......and now for some well earned tax free gains!

You beat me to it.

Any land near the stations will become more valuable than gold.

Thailand will be awash with high speed rail links one day it seems, but which day?

1 hour ago, jorj44 said:

Thailand will be awash with high speed rail links one day it seems, but which day?

Whatever day the Chinese prefer? :whistling:

On 10/23/2017 at 3:36 AM, webfact said:

The source said nearly 104,000 passengers a day were expected to use the City Line service of Airport Rail Link trains between Don Mueang and Suvarnabhumi, and 65,630 passengers a day will use the high-speed railway between Suvarnabhumi and Rayong.

 

Doesn't 65.6k passengers per day seem a bit high?  Even if there were 100 trains, that would mean 650+ passengers per train.  (100 trains/day would be roughly a departure every 15 minutes, 24/7.)

9 hours ago, jorj44 said:

Thailand will be awash with high speed rail links one day it seems, but which day?

Settled down folks. All that Thailand is awash with is artists impressions of high speed rail links.

1 hour ago, wpcoe said:

 

Doesn't 65.6k passengers per day seem a bit high?  Even if there were 100 trains, that would mean 650+ passengers per train.  (100 trains/day would be roughly a departure every 15 minutes, 24/7.)

Yes but if those figures arent exagerated then how can the costs to build be? Its well thought out, just as long as no one ever bothers to check the veracity of any of the figures presented. 

The first thing to do is make sure the concrete is purchased from the right supplier

So land will be expropriated ?...now what does that mean ? ... some boys in brown will just barge in and give you 7 days to leave your home with a shameful "compensation" ?

18 hours ago, jorj44 said:

Thailand will be awash with high speed rail links one day it seems, but which day?

 

February 30th ? :biggrin:

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.