
mahjongguy
Advanced Member-
Posts
1,369 -
Joined
-
Last visited
Content Type
Events
Forums
Downloads
Quizzes
Gallery
Blogs
Everything posted by mahjongguy
-
Pattaya Plans Red Line Monorail to Boost Urban Mobility
mahjongguy replied to webfact's topic in Pattaya News
Mod: Please move to the Worst Jokes thread. -
Worst Joke Ever 2025
mahjongguy replied to warfie's topic in Jokes - Puzzles and Riddles - Make My Day!
Conducted, they say, by the notorious terrorist group, the Baton Rouge. -
Best Wi-Fi extender for 3BB Wi-Fi 6 router.
mahjongguy replied to mahjongguy's topic in IT and Computers
If the architecture itself is iffy then that's disappointing to hear. There is a TP-LINK RE505X that has a gigabit port (and is twice the price) but now the whole idea has lost its appeal. Seems like it would be cheaper and better to get a post-pay account for the phone that will be used in that room. Thanks for your input. -
Best Wi-Fi extender for 3BB Wi-Fi 6 router.
mahjongguy replied to mahjongguy's topic in IT and Computers
True, I should have typed cat 5e. It can carry a gigabit up to 100 meters. I've done it quite a few times. I have 1000/1000 service from 3BB. This looks like what I want. Just 950 baht at BananaIT. https://www.tp-link.com/th/home-networking/range-extender/re205/ -
Moved to a new 1-story house and the Wi-Fi has pathetic range at 2.4Ghz (much less 5Ghz). Bad news is there's no central place to locate the 3BB Wi-Fi 6 router, nor any reasonable way to raise it more than 4 feet above the floor. I'm happy to pay whatever it takes to rig up an extender. Luckily the opposite corner of the house is a bedroom which has Ethernet pre-wired back to the router and its 8-port gigabit switch. So, I don't need (or particularly want) an extender that is connected to 3BB gear via Wi-Fi 6. Cat 5 wire is ready and waiting. Suggestions (that don't involve a lot of brain nor the involvement of 3BB/AIS) ?
-
Rejected for the second time
mahjongguy replied to Aforek's topic in Thai Visas, Residency, and Work Permits
Jomtien told me that since the January update there is no human scanning the applications. In my case, the server software could not cope with the fact that I haven't been out of Thailand for 15 years. -
Food Mart (by the bus station) should supply most of your cook-at-home needs.
-
Sad Pomelo Tree
mahjongguy replied to pj123's topic in Organic Farming, Smallholding and Kitchen Gardening
Quite possibly too much. I hope it gets better (or that its replacement fares better). It's the king of citrus, especially the thongdee and the pink tab tim jam. -
Sad Pomelo Tree
mahjongguy replied to pj123's topic in Organic Farming, Smallholding and Kitchen Gardening
Over-watering is harmful to many young trees, including pomelo. The roots need time to dry a little so they don't rot. Monty would say "they don't like wet feet", so water less often. Depending on the weather, this might be once a week. Cover the ground around the base with a good mulch to slow evaporation. Chicken manure seems a good choice as long as it is mixed into quality planting soil at something like 5 parts dirt to 1 part chicken sh*t. This particular tree is badly stressed. It may or may not be too late. -
Is that correct? Pretty sure the counter re-starts (at 1 One).
-
Hmm, I know you are correct about this because you are Crossy. :) But help me understand. The mechanical meter could safely and accurately provide up to 45 amps for each of the three phases. That's 135 amps total. The digital meter can provide 100 amps in total, spread evenly or unevenly across the three phases. So I would have answered (incorrectly, it seems) that the OP now has less peak load available to him.
-
Makro. Only at one of the checkout lanes. You'll need to check each lane. One will have Gillette, another lane will have Bic (on a hanger, 10 or 20 pieces. Very cheap price.. Tip: The 2-blade model gives a better shave than the 3-blade model.
-
Built a house, got a solar roof, have questions
mahjongguy replied to mahjongguy's topic in The Electrical Forum
Input yesterday from the solar vendor: at some point (when?) the developer will transfer ownership of the transformer to PEA. Two hundred and seventy days later, PEA will begin replacing any mechanical meters for customers who have applied for and are waiting for TOU and/or sellback. But, only if the province has the funds on hand at that time. My Thai partner says the government recently announced that they have completed a program of switching two million meters to digital models. So, good thing it's not urgent that we get TOU and/or sellback. I'll be dust by then. -
Built a house, got a solar roof, have questions
mahjongguy replied to mahjongguy's topic in The Electrical Forum
Interesting. We watched the wheel spin backwards for a moment but I didn't think to check the number wheels. But, I'm pretty sure the solar vendor made certain. Okay, the overall picture is getting clearer for me. Anyone ever heard this nonsense about no sellback until every lot in a mooban is sold? Referring to Chonburi. -
Built a house, got a solar roof, have questions
mahjongguy replied to mahjongguy's topic in The Electrical Forum
-
Built a house, got a solar roof, have questions
mahjongguy replied to mahjongguy's topic in The Electrical Forum
In our case, that seems like a very sensible conclusion. -
My solar dealer did a good installation of a 9.5 kilowatt system. They have submitted an application to PEA for sellback. I assumed they also requested TOU but they tell me No, that is up to me. PEA installed a mechanical 3-phase meter, so the vendor set the system never to output more than the real-time load. Q. - Why didn't PEA install a digital meter? Many of my neighbors in this new mooban seem to have solar, but not all, yet every one of them have digital meters. The developer has no intelligible answer, nor does the solar vendor. Q. - I've looked at the TOU rate tables. For a house that probably would average just over 1,000 Kwh per month but instead will be more like 400 Kwh because of the solar, would getting TOU be worth the effort? Q. - I paid more than 4,000 baht for the mechanical 3-phase meter. If I get TOU and thus a digital meter, I think it will cost about another 8,000. Does that sound right? Q. - The solar vendor told me just now, months after we moved in, that PEA won't issue any sellback contracts until every property in the mooban has been sold. Could that possibly be true? Thanks.
-
A lease registration fee (for registered leases exceeding 3 years) shall be collected at the rate of 1% of the total rental throughout the lease term and stamp duty shall be collected at the rate of 0.1%, also over the total rental throughout the lease term. So, as an example, state a monthly rent of 10,000 baht. State a term of 20 years. 20 years x 12 months x 10,000 baht x 1.1% results in a cash fee of 26,400 total for the lease registration and stamp fee. Your name will be entered on the next blank line of the chanote. This makes you the "housemaster" and will serve as a proof of address and only you determine who can live there and who cannot. BTW, there is no legal need to actually pay the rent. If you do then the recipient would have to pay income tax on it. Better to let the unpaid rent pile up as a defense against a relative of the owner who (upon the owner's demise) might try to falsely claim possession of the property. NB: a lease is great but it is a one-way street. If you paid for the property you cannot get your money back. Only at the end of the term (of the lease or of your existence) does the lease terminate. If the relationship fails then the only solution is to negotiate a price for which you agree to relinquish your lien on the chanote. Or just walk away.
-
3BB called me this morning to say it's their whole network.
-
You can get a lease at the Land office using their standard form and its very limited conditions. If you want to add ability to sublet, inability for the homeowner to sell, or any other non-default conditions, you will indeed need a lawyer to create a customized contract. I have done it both ways. BTW, don't forget to bring along enough cash to pay the tax on the lease.
-
installing an 8,000 watt water heater
mahjongguy replied to mahjongguy's topic in The Electrical Forum
Is it correct to say that the main reason to add MEN earthing to a TNC-S system is to avoid the dangers of PEN failure? -
installing an 8,000 watt water heater
mahjongguy replied to mahjongguy's topic in The Electrical Forum
You think it unnecessary to put RCBO on aircon units? They are metal, they have 220 inside, often sit in wet areas. So I just assumed... -
installing an 8,000 watt water heater
mahjongguy replied to mahjongguy's topic in The Electrical Forum
That is excellent news. -
installing an 8,000 watt water heater
mahjongguy replied to mahjongguy's topic in The Electrical Forum
Thanks for the well-considered reply. 1) Well, okay, I'll buy the most expensive brand. ???? 2) At the moment we have a mechanical 3-phase 15/45. In a few months PEA should finally process our contract application and put in a TOU meter. I don't know what the specs will be. 3) The mains cables are strictly copper. They run about 15 meters, most of that distance underground in striped black hose.