Jump to content

Pattaya mulls long-term fix for Kratinglai Canal


Recommended Posts

Posted

Pattaya mulls long-term fix for Kratinglai Canal

image.png

PATTAYA:--Pattaya city has dredged the Kratinglai Canal and is preparing to expand the waterway in an effort to relieve chronic flooding.

 

Deputy City Manager Passakorn Usomboon and Sanitation Department workers surveyed the area and canal drainage at Paisan village.

 

Currently, the canal is shallow and narrow in some parts with weeds and garbage blocking the waterway. The result has been frequent flooding in the village.

 

Initially, canal dredging was done to get rid of weeds and garbage blocking the waterway on both sides of the bridge.

 

For the long-term, Pattaya will survey the area and determine the best way to solve the problem. It may require the bridge to be lifted or large box culverts installed.

 

 
pattaya_mail_logo.jpg
-- © Copyright Pattaya Mail 2018-11-09

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...