Jump to content

Repair budget set for neglected Koh Larn bridge


Rimmer

Recommended Posts

Repair budget set for neglected Koh Larn bridge

n2-J-15-03-Koh-Larn.jpg

KOH LARN:--Pattaya plans to repair Koh Larn’s neglected Tien Beach bridge, but not until next year.

 

Deputy Mayor Ronakit Ekasingh said July 15 that a 4.5-million-baht budget has been requested for 2020 to fix the bridge which local residents claim is near collapse.

 

Locals at the third-most-popular beach on the island said there have been no lights on the bridge for a decade and, now neglect has caused the very foundation of the four-meter-high bridge over a shoreline of rocks to degrade.

 

About half the 500-meter span has no railing, the steel posts and foundation are rusted and various parts and joints are missing. The bridge could collapse at any time, residents fear.

 

City hall engineers already have blueprints for a renovated bridge. The Pattaya City Council will decide whether to approve the spending Aug. 5.

 

-- PATTAYA MAIL 2019-07-19—

Link to comment
Share on other sites

That bridge looked like it was going to collape 8 years ago when I visited Koh Larn. No railing on the seaside so you could fall into the rocky coastline. Rusted rebarb sticking up where the concrete had degraded and holes in the concrete deck. Amazing it had gone this long without repairs or collapsing. 

Link to comment
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Recently Browsing   0 members

    • No registered users viewing this page.




×
×
  • Create New...