Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Egat prepares to shut down Mae Moh coal mine in Lampang

Featured Replies

Egat prepares to shut down Mae Moh coal mine in Lampang

By THE NATION

 

800_80c04522fa5eb03.jpg

 

The Electricity Generating Authority of Thailand (Egat) has drawn up a plan to shut down the Mae Moh coal mine in Lampang province as the mine’s lifespan will end in the next 30 years, Egat deputy governor for fuel Tawatchai Jakpaisal has said.

 

 

Coal supply from the mine has been dwindling.

 

The state agency has earmarked some revenue from the coal sales to support the mine closure plan and for creating new jobs for villagers working at the mine.

 

It will also undertake reforestation of the mine, which occupies 40,000 rai.

 

He added that the reforestation would create a small water reservoir in the location where a floating storage could be installed to generate electricity.

 

Egat has already decommissioned units 1 to 3 of the electricity generating units, while 4 to 7 of the units were replaced by the RP1 unit, which has a capacity of 655 megawatts and started operation early this year.

 

Units 8 to 9 will retire in 2025. Egat is conducting a public hearing on the plan to build the RP2 plant to replace them. The new plant will have a capacity of 650MW.

 

Units 10 to 13 will be decommissioned after 2025 as it was estimated that the coal supply in the mine will not be enough to feed them.

 

The Mae Moh power plant has a total capacity of 2,400MW. The new units, which were built or will be built to replace the retired ones, will be decommissioned at the same time the mine runs out of supply.

 

Source: https://www.nationthailand.com/business/30377770

 

logo2.jpg

-- © Copyright The Nation Thailand 2019-10-27

This should have a positive effect on air pollution in that area, the coal burning power generators in Lampang are some of the worst polluters in the country.

10 hours ago, saengd said:

This should have a positive effect on air pollution in that area, the coal burning power generators in Lampang are some of the worst polluters in the country.

Time will tell.

I believe the replacement plant may follow previous replacement plans and be powered by indigenous lignite as the main fuel:

  • equipped with the supercritical pressure steam generator to obtain higher efficiency, resulting in less fuel use, and therefore less carbon dioxide emission. Furthermore, the plant will be equipped with the Flue Gas Desulfurization (FGD) System, the Low NOx Burner System, the Electrostatic Precipitator (ESP) System, and the new Selective Catalytic Reduction (SCR) System.
  • The SCR will reduce the nitrogen oxide emission, thus helps effectively control the environmental impact.

https://www.egat.co.th/en/news-announcement/news-release/contract-for-mae-moh-units-4-7-replacement-signed-to-help-strengthen-power-system-in-the-north

https://www.sourcewatch.org/index.php/Mae_Moh_power_station

 

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.