Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Rama II road to open 4 more lanes in December

Featured Replies

Rama II road to open 4 more lanes in December

By The Nation

 

800_92f086cb393cda9.jpg?v=1602665220

 

Construction work to widen Rama II Road (Highway 35) is scheduled for completion in December, when the 11.7-kilometre Bang Khunthian-Ekkachai stretch will be expanded from 10 to 14 lanes.

 

The road widening would ease traffic congestion on the main route from Bangkok to the South, said Sarawut Songsivilai, director of Transport and Traffic Policy and Planning.

 

Widening work was 83 per cent complete, with only two U-turn bridges left to be constructed, he added.

 

Meanwhile, the first 10km of Rama II’s elevated Bang Khun Thian-Ban Phaeo section should be ready to open by 2022, Sarawut said.

 

Source: https://www.nationthailand.com/news/30396199

 

nation.jpg

-- © Copyright The Nation Thailand 2020-10-15
 
  • Popular Post
14 minutes ago, webfact said:

Rama II road to open 4 more lanes in December

Death race 2020 in quadraphonic .. 

  • Popular Post

Good news for us who travel to Hua Hin on a regular basis, hopefully the elevated section is completed on time as well.

Any improvement west of BKK heading westerly or south is welcomed.

That road has been a mess for over 20 years!

7 hours ago, sungod said:

That road has been a mess for over 20 years!

I,ve been doing a monthly return trip from Pattaya to our house in Trang for the past 6 years so it will be welcomed when it,s finally completed :thumbsup:

4 hours ago, OnTheRun said:

Good news for us who travel to Hua Hin on a regular basis, hopefully the elevated section is completed on time as well.

I wonder how it will go, I mean it shortcut the 4 or the 35?

Or it is the 35? Where they working for long time on.

Edited by Peterphuket

27 minutes ago, Peterphuket said:

I wonder how it will go, I mean it shortcut the 4 or the 35?

Or it is the 35? Where they working for long time on.

It's just the same existing highway (35), widened by a few lanes until Samut Sakhon.

 

14 minutes ago, kotsak said:

It's just the same existing highway (35), widened by a few lanes until Samut Sakhon.

 

But than the bottleneck before the Rama 9 bridge and tolboot.

6 minutes ago, Peterphuket said:

But than the bottleneck before the Rama 9 bridge and tolboot.

That should be taken care of with the new expressway connecting Rama 3 with Dao Kanong. Construction has already been started in the Rama 3 area.

2 minutes ago, kotsak said:

That should be taken care of with the new expressway connecting Rama 3 with Dao Kanong. Construction has already been started in the Rama 3 area.

Ok, I'm not aware of that, so often I don't come there, anymore.

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.