Popular Post Kinok Farang Posted December 5, 2023 Popular Post Share Posted December 5, 2023 Been watching the new roads being built(sometimes 2or 3 times)in Jomtien over the years with very little improvement. Most motorists will know that a big percentage of road damage is around the man-hole and grate covers.So why do the Thais insist on building the man-holes (complete with lid)first?Sure the civil engineer will have given them a finished level to work to but it is pretty much impossible to get them right that way. Why not wait until the road forms are in place,outside and camber then pull two string lines across to get a surface that is millimetre perfect? All the new roads i see start off with loads of man-holes just stuck up in the air.Idiotic. 1 2 4 Link to comment Share on other sites More sharing options...
scubascuba3 Posted December 5, 2023 Share Posted December 5, 2023 the man holes / drains seem to be purpose built blocks, the only road I know where they are level is Siam Country Club where they did a good job, everywhere else is uneven, Thai logic 1 2 Link to comment Share on other sites More sharing options...
charleskerins Posted December 6, 2023 Share Posted December 6, 2023 21 hours ago, Kinok Farang said: Been watching the new roads being built(sometimes 2or 3 times)in Jomtien over the years with very little improvement. Most motorists will know that a big percentage of road damage is around the man-hole and grate covers.So why do the Thais insist on building the man-holes (complete with lid)first?Sure the civil engineer will have given them a finished level to work to but it is pretty much impossible to get them right that way. Why not wait until the road forms are in place,outside and camber then pull two string lines across to get a surface that is millimetre perfect? All the new roads i see start off with loads of man-holes just stuck up in the air.Idiotic. That's the way we do it in the states ,here I have seen them paved over and then they come back with 2 man crew and chisel away the blacktop but then they don't outline with tar thus blacktop erodes. They also don't seem to believe in finish grading and seeding the private property that have disturbed in the process. 1 1 Link to comment Share on other sites More sharing options...
roger101 Posted December 8, 2023 Share Posted December 8, 2023 On 12/5/2023 at 2:43 PM, scubascuba3 said: the man holes / drains seem to be purpose built blocks, the only road I know where they are level is Siam Country Club where they did a good job, everywhere else is uneven, Thai logic It's probably good there because Honda Golf told them a few years ago that if they didn't improve the road they would take the Honda Ladies Golf from Siam Country Club and relocate to a different golf course. At the time the road was probably one of the worst in Pattaya. 1 Link to comment Share on other sites More sharing options...
mran66 Posted December 8, 2023 Share Posted December 8, 2023 So many whys and why-nots, same in road building and basically in all other areas of human activity. Robots in factories programmed by foreign engineers work good though told one guy who works in such place. We all know why. 1 Link to comment Share on other sites More sharing options...
Popular Post Kinok Farang Posted December 9, 2023 Author Popular Post Share Posted December 9, 2023 13 hours ago, mran66 said: So many whys and why-nots, same in road building and basically in all other areas of human activity. Robots in factories programmed by foreign engineers work good though told one guy who works in such place. We all know why. I have read this post 3 times now and still can't fathom it out!🤔 1 1 1 Link to comment Share on other sites More sharing options...
digbeth Posted December 9, 2023 Share Posted December 9, 2023 different contractors, the sewer/storm drains is one job, and the re-paving of road surface is by another contractor, and may not even be ordered by the same authorities, the city or water might be able responsible for the drain, but the road is under highways department, and good luck getting Thais to plan things to finish together Link to comment Share on other sites More sharing options...
mran66 Posted December 9, 2023 Share Posted December 9, 2023 2 hours ago, Kinok Farang said: I have read this post 3 times now and still can't fathom it out!🤔 555 fathom out my post, or fathom out why things work or don't work in Thailand? Link to comment Share on other sites More sharing options...
Seppius Posted December 9, 2023 Share Posted December 9, 2023 2nd road being dug up again, horrendous traffic jams last night Link to comment Share on other sites More sharing options...
Kinok Farang Posted December 9, 2023 Author Share Posted December 9, 2023 2 hours ago, mran66 said: 555 fathom out my post, or fathom out why things work or don't work in Thailand? Both mate but i like your sense of humour,cheers. 1 Link to comment Share on other sites More sharing options...
jacko45k Posted December 10, 2023 Share Posted December 10, 2023 19 hours ago, Seppius said: 2nd road being dug up again, horrendous traffic jams last night Yeah, I recently noticed it was dug up again near soi Post Office... I had thought it was done, but apparently not, must have been a bit left over! Link to comment Share on other sites More sharing options...
Tarteso Posted December 10, 2023 Share Posted December 10, 2023 On 12/5/2023 at 1:55 PM, Kinok Farang said: Sure the civil engineer will have given them a finished level 🤔 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now