Jump to content

Pink7

Advanced Member
  • Posts

    651
  • Joined

  • Last visited

Everything posted by Pink7

  1. I consider cut some pieces of the extra bars who i get with the batteries with a exact drilled hole and place between the pole and connector as a washer. Pink
  2. So now its time to get the batteries and JK BMS mounted together. I think I have a quite small contact area between battery connector an the battery pole. Any thoughts on this? Pink
  3. So today i have done more testing and with real sun conditions ( yesterday testing was just as sun was going down) Both inverter DC270+ in and AC 230 out with only solar connected ( no battery yet and no AC in) So all good !!! Pink
  4. This afternoon solar was connected to my 2 x Growatt inverters. I checked the dc power (DC 250 each) and powered it on. Im not sure if Growatt SPF500ES really can do battery-less because i connected a wire to Ac out breaker on the one inverter and there was no AC Power. Tomorrow i will try the other one when have sun again. When i turn the switch to power it up first time it did not start because i forgot to open DC breaker with solar power. Its not to much work left now then it should hopefully be ready. Pink
  5. More experienced than skilled. So i was thinking of join the wires together with some soldering. I will be ok but i know it could be done more beautiful than i do. Usually i will twin the wires together and fold the joint then solder it then shrink tube. In this case might not fold it, just twin together and wire. Pink
  6. 4 of my wires to BMS is a bit short to reach the batteries in bottom of my build. Extend the needed 4 wires or get a JST extension for the whole set of wires? Pink
  7. And then the tool decide to be working again..After try taking it apart and back again. Pink
  8. Good idea. Plan one now is a DIY with some of the parts from the crimp tool and some steel and a hammer. Pink
  9. Some progress last days on cables and breaker boxes etc, but have to do some changes from my plans as the cables much less flexible than i expected. I was just making cables from breakers to batteries now when the tool to crimp the connectors just stop working, so i must check if i can replace the hydraulic. So it held up 10 connectors or so.. Pink
  10. I have a feeling that Thailand just get hotter for every year.. Pink
  11. I soldered quite a few XT60 ( Building and flying Rc Helicopters and Gliders) Still not happy with the outcome of the soldering.. Pink
  12. I will check 2 mechanic friends who live near me. They must have 4 of this connectors i guess. Pink
  13. I was plan to solder, i need to solder on the terminal connectors on the battery cables also. Why not solder to the switch? Pink
  14. Back in business guys... Got up more water storage and also improved water filtering and added a waterpump. Things at times take more time than normal..I dont have quite same energy as im used to in younger days and in colder climate. What i need now next is to get my breaker boxes ready and cabled. Regarding the pre charger: I will follow the drawing and plan discussed with Crossy. When it come to the momentary switch. Anyone know what 2 pinst to connect too? there is 2 pins in side and 2 under. Pink
  15. Been to busy and hot latterly to work on this but its not much left and it should be all ready. Hopefully sine progress and updates soon. Pink
  16. My delivery around 25 kg and it was by land, 12-13 days or so Pink
  17. 2 x GROWAT SPF5000ES Shipping cost:236USD ship by Thailand Special Line including Customs declaration and tax. Pink
  18. Good idea. I have a 16mm2 solid copper wire i could use that way. Pink
  19. I just did another test where i used shera after 4 levels up, then i got better leveling and stability. If i end up doing it it means some custom busbars. Even im happy with the quality on my cells its not as easy or exact to build this way as if i just used to "normal" side down. Pink Pink
×
×
  • Create New...