Would I not need be concerned about balancing the load on each leg to minimize my usage?
Does the MEA bill the three-phases individually and sum them, or just based on the leg with the highest load?
I know this what a real big deal at out US plants.
Would it make sense to have a 100A three-phase panel to supply my three-phase, and a 25KVA three-phase 380 to single-phase 220 transformer to one 63A single-phase 220 panel?
I am generally a fan of lawyers, but I would negotiate the payment schedule to be back-loaded such that a significant portion is payable after you take possession of the property.