Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Project for new 4-lane road connecting east & west Samui

Featured Replies

"Around Surat Thani Update" has shared project map with a new 4-lane road connecting east-side and west-side of Koh Samui between Chaweng Noi near Wat Saket, Bo Phut, and Taling Ngam near Sheraton Samui Hotel.

What do you think?

The map shared below is with Google-translation...

Samui_high_way_translated_image_en.png

The English text below is a more detailed explanation from Mr. Tee Lawyer's Facebook profile:

«Koh Samui New Road

Feasibility Study and Environmental Impact Assessment (EIA) Report Preparation Project for the West–East Road Network Connection on Koh Samui.

Koh Samui, has its main transportation route as the Ring Road around the island (Highway No. 4169), which is approximately 50 km in length. At present, one of the major issues is the inconvenience of traveling between towns on the island.

Due to long travel distances and various geographical obstacles, travel times are considerably lengthy. As tourism is the primary industry of Koh Samui, the island’s tourism sector has been unable to fully develop because the transportation system is not yet sufficiently comprehensive or well connected. Furthermore, in emergency situations requiring travel to government centers on Koh Samui, such as medical emergencies requiring immediate access to hospitals, transportation cannot always be carried out promptly.

The Ministry of Transport assigned the Department of Rural Roads to conduct a feasibility study for the development of the rural highway network on Koh Samui. The study was completed in 2022. According to the study findings, the road connection linking Highway No. 4169 from the western side to the eastern side of the island (W–E Corridor) was identified as the highest-priority project under the Koh Samui rural highway network development plan.

The proposed route would provide several important benefits, including improving traffic flow and reducing congestion on the island’s main road network. The route would also connect the western ferry pier area to the airport on the eastern side of the island and serve as an important access route to key tourist attractions, such as Buddhadīpankara Meditation Center and Wat Saket.

Project Route Map – New Road Connecting the West and East Sides of Koh Samui.

The project aims to establish a more efficient transportation network on the island, reduce traffic congestion, and provide additional travel route options. 🛣️🚘

Route: Taling Ngam – Bo Phut 🏝️
Project details:
Road type: 4-lane roadway
Project starting point: Area near Wat Saket
Project ending point: Area near Sheraton Samui Resort
Source: Around SURAT THANI Update»

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.