Jump to content

MJCM

Advanced Member
  • Posts

    12,981
  • Joined

  • Last visited

Posts posted by MJCM

  1. 1 hour ago, Fruit Trader said:

    Not everyone is nervous, for some; DIY solar is a hobby and take ROI far less seriously.

    +1

    Absolutely in our case I never cared about the ROI when I started thinking about Solar, the Wife did at first, but that said since the beginning we have grown from a Simple GTI (3 panels) that just feeds energy back into the grid to a On-Grid Sofar 5kW Inverter with 10 Panels and producing enough to supply the house with electricity and the left over is feed back in to the grid. (But have to limit the feed-in drastically (currently at 0.5kW) because of the danger of going into negative territory ???? 

    Next step (future) is Hybrid Inverters (2x 5kW) and a ESS of around 30kW (but want to start with around 10kW at first)

     

    • Like 1
  2. 15 minutes ago, AAArdvark said:

    I just did my first online in 5 years and it was accepted and pending.  Jomtien

    Just check regularly because you are NOT done yet, it should hopefully soon say "Approved" then you can print out the PDF with your new reporting date and put that in your Passport if you like

  3. Question please

     

    I have ordered a new CT online. Now I want to run a separate Cable (because the current CT cable is underground in HDPE) to the Inverter.

     

    The distance is approx 20-25m. The current cable (for CT) (That is in the HDPE) is 2 x 1.5mm²

     

    Would 2x0.5mm² x 20-25m be good enough to test the NEW CT or should I go 2x1mm² ?

     

    Of course will also test with the current cable but I want to exclude that the (current) cable is the problem or maybe it's the connection.

  4. 9 minutes ago, jim234 said:

    Does this mean every circuit has its own RCBO? The obvious advantage of this is that when there is a fault, only 1 circuit will be cut off instead of 4 circuits

    That is what I have in our House, 1 RCBO (Schneider) for every circuit, problem is it is not cheap, but I would rather be without power on one of the circuits then have to go through something like this

     

     

  5. 4 minutes ago, Lemsta69 said:

    based on my experience the online system adds an extra day.

    That is IMHO weird, but I can't comment on that because ONLINE never worked for me.

     

    Luckily it's not a problem because you have the 7 days after Due Date in which you can report without consequences (however YMMV ???? )

×
×
  • Create New...