Jump to content

Construction of Thai-Chinese high-speed rail slated to begin next year


rooster59

Recommended Posts

Construction of Thai-Chinese high-speed rail slated to begin next year

Thana Boonlert

 

PNOHT611123001021401.jpg

 

BANGKOK, 23rd November 2018 (NNT) – The government has assured the public that construction of the first phase of the remaining three sections of the Thai-Chinese high-speed rail between Bangkok and Nakhon Ratchasima will begin in April next year. 

At the 26th Meeting of the Joint Committee on Railway Cooperation between Thailand and China, both countries followed up on the progress of the construction of the first phase of the Bangkok-Nakhon Ratchasima route, the second phase of the Nakhon Si Thammarat-Nong Khai route, and the financial partnership. 

Currently, the construction of the first phase’s 3.5-kilometer section from Klang Dong to Pang Asok is making significant headway whereas the construction of the first phase’s 238.5-kilometer remaining three sections will start in April next year. This route is to begin operations in 2022. 

Meanwhile, Thailand is planning to review findings for the construction of the second phase’s 355-kilometer Nakhon Si Thammarat-Nong Khai route. China suggested that all stakeholders follow up on the rail link in Nong Khai with Laos. Talks are expected to take place in January next year. 

Transport Minister Arkhom Termpittayapaisith added that China proposed a loan with an interest rate of 3 percent per year, but Thailand is negotiating for a drop to 2.6 percent year. A conclusion is expected in December.

 

 
nnt_logo.jpg
-- nnt 2018-11-25
  • Haha 2
Link to comment
Share on other sites

A number of countries in the region have become prisoners to Chinese financing and debt, the Maldives is the latest to realise that they are now effectively broke as a result, I hope Thailand is not planning on going down that same road:

 

https://www.cnbc.com/2018/03/05/chinas-belt-and-road-initiative-raises-debt-risks-in-8-nations.html

 

  • Like 2
Link to comment
Share on other sites

2 hours ago, Tailwagsdog said:

WOW that's great, sorry just explain to me again how youre going to pay back billions with the train fares. Logic would suggest hi speed links between Pattaya-Rayong, Hua Hin & Ayuttyha with good frieght rail links to the regional cities & deep water ports to decentralize industry would be money better spent. What is a high speed train to southern china going to bring? 

Many snouts to feed at the trough. :tongue:

Link to comment
Share on other sites

5 hours ago, Tailwagsdog said:

WOW that's great, sorry just explain to me again how youre going to pay back billions with the train fares. Logic would suggest hi speed links between Pattaya-Rayong, Hua Hin & Ayuttyha with good frieght rail links to the regional cities & deep water ports to decentralize industry would be money better spent. What is a high speed train to southern china going to bring? 

who talks about "pay the loan back to the Chinese"? 

lesson no. 1 of Thai economics: A loan is to be regarded a present with an option to show (financial) thankfulness from time to time

  • Haha 1
Link to comment
Share on other sites

5 hours ago, Tailwagsdog said:

WOW that's great, sorry just explain to me again how youre going to pay back billions with the train fares. Logic would suggest hi speed links between Pattaya-Rayong, Hua Hin & Ayuttyha with good frieght rail links to the regional cities & deep water ports to decentralize industry would be money better spent. What is a high speed train to southern china going to bring? 

Hi so Tourists?

Link to comment
Share on other sites

5 hours ago, rooster59 said:

Transport Minister Arkhom Termpittayapaisith added that China proposed a loan with an interest rate of 3 percent per year, but Thailand is negotiating for a drop to 2.6 percent year.

February 2015 -

  • Deputy Transport Minister Arkhom Termpittayapaisith said that China's proposed 2-4% was considered too high compared to the 1.5% offered by the Japan International Cooperation Agency (JICA) which was the major creditor of the Airport Rail Link construction.

http://englishnews.thaipbs.or.th/ministry-asks-china-ease-loan-conditions-first-standard-gauge-railway-route/

  • Transport Minister ACM Prajin Juntong said that Thailand needs lending interest rate below 2% annually.
  • China says 2% is what they charge for underdeveloped countries like Laos where China could seize Lao assets if the government defaults on debt payments.

August 2017 -

  • Arkhom argued that China’s government is also demanding a high interest rate from Thailand, higher than it granted Indonesia for a similar project.
  • “Our sovereign credit rating is higher than Indonesia and some other countries in the region” yet,
  • current yields of 10-year bonds issued by the Thai government were slightly over 2%, comparing favorably with the nearly 7% per annum of Indonesian government bonds.  

http://www.nationmultimedia.com/detail/national/30323682

Possible China's motivation for a higher interest rate:

June 2017 -

  • Academics have cautioned that the Sino-Thai high-speed train project could end in bankruptcy and fail to develop sought-after technology in Thailand.  
  • Economist and Director of the Institute of Asian Studies at Chulalongkorn University Nuannoi Trirat said the current project in Nakhon Ratchasima was likely to end in bankruptcy as there were limited passengers and many transportation options.
  • Former Director of the Transportation Institute at Chulalongkorn University Sompong Sirisoponsilp said the government had not thoroughly considered the project (such as such as connectivity to other transportation systems, the competitiveness of the project compared to buses or airplanes, the customer group) which will result in a total economic failure and a loss of other benefits that the government expected.

http://www.nationmultimedia.com/news/national/30318843

6 hours ago, rooster59 said:

the first phase of the remaining three sections of the Thai-Chinese high-speed rail between Bangkok and Nakhon Ratchasima will begin in April next year. 

And still no firm loan agreement?

 

 

 

 

 

 

 

 

  • Like 2
Link to comment
Share on other sites

More Bullshit for the small brained masses from the Military chest beaters who like making big noises but achieve little.

 

26 Meetings and they still haven't got 3.5 Klicks of test track, not to mention a loan agreement of any sort despite 26 free lunches with the finest booze to match whilst discussing the slicing up of 'how much for the boys' in all this then ?

 

IF it ever gets built, or even half built before abandonment, it will lumber the future generations with a bankrupt future, whilst 'The Generals' retire with their ill gotten gains to their luxury pads in Lands elsewhere financed by a life of total corruption.  It makes you Puke !!

  • Like 1
Link to comment
Share on other sites

2 hours ago, DrTuner said:

Well it does take time to gather and dry the bamboo for the thing. And they need to find a buffalo capable of 250km/h, too.

I am sure that the environmental assessment would have allowed for the copious amounts of bovine waste to be generated - just hope they also considered the equally large amount of methane that will be produced.

Link to comment
Share on other sites

So far the sweet spot for High Speed is three hours travel time, anything over is uneconomical and depending on lots of factors whether any that do run two to three hours travel time will ever run at a profit, the only one up to last year to run at a profit in China was the Beijing Shanghi line , there's a good write up in 2016 in Time Mag " What ever You do Don't mention High Speed Rail". a must read, end of story.  

Link to comment
Share on other sites

There is so much bullshit in that article I don't know where to start

3.5K "Phase" 1  That would be another 80 3.5k "Phases" until competition

Significant Headway, On paper the "Phase"1 Started October 17 so the 1 metre per day construction

355Kph Not a hope

Link to comment
Share on other sites

On 11/25/2018 at 8:58 AM, Tailwagsdog said:

WOW that's great, sorry just explain to me again how youre going to pay back billions with the train fares. Logic would suggest hi speed links between Pattaya-Rayong, Hua Hin & Ayuttyha with good frieght rail links to the regional cities & deep water ports to decentralize industry would be money better spent. What is a high speed train to southern china going to bring? 

Maybe the question should be "What is a high speed train to southern China meant to take?"

Link to comment
Share on other sites

On 11/25/2018 at 7:55 AM, rooster59 said:

Meanwhile, Thailand is planning to review findings for the construction of the second phase’s 355-kilometer Nakhon Si Thammarat-Nong Khai route

Interesting that they will cut a 1.420 km distance to 355 km.

Thai mathematics...

Link to comment
Share on other sites

8 minutes ago, PoorSucker said:

Interesting that they will cut a 1.420 km distance to 355 km.

Thai mathematics...

Maybe there will be a ramp at the end of line to swing the bullet train to a ballistic trajectory for the rest of the way.

  • Haha 1
Link to comment
Share on other sites

1 hour ago, bluesofa said:

You just can't have too many meetings.

 

Meetings - the sensible alternative to work.

 

There's quite a lot of doubting Thomases out there, perhaps foreigners should come to Thailand and learn how to create a high-speed railway.

 

No?

 

 

Edited by HalfLight
  • Haha 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.









×
×
  • Create New...