Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Controlled explosions demolish remains of collapsed Italy bridge

Featured Replies

Controlled explosions demolish remains of collapsed Italy bridge

 

Screenshot 2562-06-28 at 17.22.18.png

Controlled explosions demolish two of the pylons of the Morandi bridge almost one year since a section of the viaduct collapsed killing 43 people, in Genoa, Italy June 28, 2019. REUTERS/Massimo Pinca

 

GENOA, Italy (Reuters) - Six seconds of controlled explosions wiped out the remains of a collapsed bridge in the northern Italian city of Genoa on Friday, paving the way for a new structure to replace the ageing viaduct that gave way last year, killing 43 people.

 

Explosives tore down two towers of the Morandi bridge as cannons shot water over the 20,000 cubic meters of steel and concrete to prevent huge clouds of dust engulfing the city.

 

The bridge collapsed on August 14 in heavy rain, sending dozens of vehicles plunging 50 meters to the ground below.

 

The collapse has made access to Genoa’s busy port more difficult and has also meant a lengthy detour for drivers wanting to head onwards to southern France.

 

The government of the anti-establishment 5-Star Movement and the right-wing League wants its rapid reconstruction, hoping to signal a departure from the corruption and inefficiency that have often plagued Italian infrastructure projects.

 

 

5-Star leader Luigi Di Maio and League chief Matteo Salvini, both deputy prime ministers, attended the demolition, after Infrastructure Minister Danilo Toninelli laid the first stone of the new viaduct earlier this week.

 

“Today not only the old bridge comes down, but the new one starts coming up,” Salvini said.

 

The reconstruction was assigned to Italian firms Salini Impregilo and Fincantieri. Designed by the renowned Genoa-born architect Renzo Piano, the new viaduct is planned to be inaugurated by the middle of next year.

 

It remains unclear whether the government will keep its promise to revoke the concession of toll road operator Autostrade per l’Italia, a unit of infrastructure group Atlantia which was in charge of the bridge’s maintenance.

 

Rome has accused the operator of serious failings in its upkeep of the bridge. Autostrade has denied wrongdoing, saying regular, state-supervised inspections had indicated the ageing viaduct was safe.

 

The revocation procedure started a few days after the bridge collapsed, but the coalition parties are now divided.

 

Writing by Angelo Amante, editing by Gavin Jones and Mark Bendeich

 

 

reuters_logo.jpg

-- © Copyright Reuters 2019-06-28

 

 

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.