Popular Post bodga Posted January 1, 2021 Author Popular Post Share Posted January 1, 2021 (edited) Update, heard nothing from the sheeeeite company, guess they figure not worth pursuing, have finished their beam myself using my concrete mixer, then done 10 panels 3 inch thick, these are about 9 feet long 3 feet wide, they slowly get smaller down to 6 foot max length towards the end. Smashed in more metal poles 1.5 metres long then welded rebar to it, threw in after breaking up the old slab as hard core. Reckon Ill be done in about 3 weeks although holidays will eat into that, didnt want to do any of this but its the only SAFE way. I havent employed anyone here for 7 years to do any work and it seems I never will anywhere in Thailand after this final episode. Note added the weep holes which are 1.5 inch pipe back thru to earth not blocked so water should drain freely out. Edited January 1, 2021 by bodga 3 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now