Skip to content
View in the app

A better way to browse. Learn more.

ASEAN NOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Need a competent Electrician in the Buriram / Surin area

Featured Replies

We are in the process of upgrading our solar Install from now a Grid Tied system, to a Hybrid system complete with a Battery storage system.

Our Grid tied system is working perfectly for well over 2 years, but to make the final connections in the House Wiring we need a competent Electrician.

We had a very good electrician but he unfortunately passed away last month (no not for being electrocuted).

All the basic layouts all already in place and also all cables are also in place just the main hookup for the MAINS cable to the Hybrid inverter is something I believe still needs to be connected. We will pay well over the standard daily wage and even pay for petrol.

We are not in a rush so. and please any question via PM.

Our location is roughly in between Buriram City and Surin City,

TiA

Edited by MJCM

Get in touch with @Bandersnatch he seems happy with his solar installer from Surin.

  • Author

thx @carlyai

Will do, but to emphasise, the work we need doing is in the house wiring.

The main work there has already been done (read: Isolation of appliances to only use PEA instead of Solar) by our former Sparky it's just connecting a mains cable to the house wiring which will be then plugged into the Hybrid Inverter,

Cable pulling etc has already been done, it's just the connecting in the house panel that needs to be doing.

He's the only one I know in the Sarin area.

My electrician friend who I did my solar with can do all that and good job but lived at Udon Tani.

I can give you his name and number if you want.

Does a good job.

Why not look for a solar installation company and ask if they are willing to just finish off the wiring? You may find a competent electrician but if they are not familiar with solar installations they may not complete the wiring safely.

  • Author
4 hours ago, alanrchase said:

Why not look for a solar installation company and ask if they are willing to just finish off the wiring? You may find a competent electrician but if they are not familiar with solar installations they may not complete the wiring safely.


A Solar install company will not take on this job, it's a very small job. And again it has not much to do with the Solar install. It's just the cable that plugs into the Hybrid inverter to has to be connected to the house CU. See screenshot.

Everything else has already been done, I am just not 100% sure that this cable has been connected to the HOUSE CU, thus why asking for an electrician. Also please NOTE the current Grid-Tied Inverter (Ps: Not the One in the screenshot as that is the new Hybrid Inverter) is already working very well for over 2 years.

Screenshot 2026-08-15 at 15-33-13.jpg

Can't you turn off your current grid tie inverter and see if you loose house power?

If you loose power then the new hybrid inverter is not connected.

  • Author
9 hours ago, carlyai said:

Can't you turn off your current grid tie inverter and see if you loose house power?

If you loose power then the new hybrid inverter is not connected.

Thx @carlyai

When we now turn of the current SOFAR grid-tied inverter we will not lose house power as the house will then use ONLY the PEA.. Only when the PEA is down we will lose house power even when there is lots of sunshine. (That is why we are switching to a Hybrid System)

The new Hybrid Inverter will be connected to batteries (20kW+) so when the PEA loses power the Inverter will feed the house via Solar (When available) or through the Batteries. The power from the Inverter to the house will have to go through that cable that is why it needs to be connected to the house cu.

So to have an electrician connect that cable to the house cu, is one of the jobs that still need doing / verifying. We have the time as we are still waiting on the Batteries.

  • Author

Maybe to clarify, the NEW Hybrid Inverter and the Batteries aren't in place yet, the Grid-Tied inverter is still doing it's job

The Hybrid Inverter we already have (PowMR 10kW) but it's waiting for the 20kW+ batteries, thus we want to verify that the cable that will feed the house with power coming from the Inverter is in place when we replace the grid-tied one with the new install.

Edited by MJCM

Not an answer to your post but have you tried talking with the local PEA for someone to do the job?... I'm in a similar boat.... I'm replacing my roof with existing 10KW come January after the wet season... Same thing as you with power outages... I'm down Nang Rong... Nong Ki... Highway 24 area 100km ish from Burriram... While the roof is off I want to rewire so I can have power from battery and solar when there are power cuts.... I have visited PEA twice over the last month trying to Export power to the grid.... They said someone would call....not yet...!!

I have found that the guys who get around in the Orange PEA trucks are really helpful... They did stuff around my Bahn during a blackout and found problems with wiring in the house.... In the west that doesn't happen... cost a Leo for each person...Luv Thailand....

I have a few months to sort my solar out (Huawei) and find a good solar installer with wiring knowledge so if you find someone locally I would be pleased to know also..

  • Author

@Thaifish

Thx for the advice it's absolutely solid, but in your case they Know that you have Solar and In our case they don't, and I rather keep it that way. ("let sleeping dogs lie").

But I fully understand your reasoning, the PEA guy who did the inspection of our house so we could switch to the permanent meter (from a construction meter) was rather knowledgable.

9 hours ago, Thaifish said:

Orange PEA trucks are really helpful... They did stuff around my Bahn during a blackout and found problems with wiring in the house.... In the west that doesn't happen... cost a Leo for each person...Luv Thailand....

Absolutely, in Australia they'd find a way to issue you a several hundred dollar fine. 💲💲

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.