Jump to content

Construction Across From Villa Mart


alansiporin

Recommended Posts

Do you mean Villa Market?

Which one?

There are 3.....

Unless there is also a new tunnel and hospital near other Villa markets, I think it was very clear which one the OP meant.

There is a tunnel being built outside villa market boat lagoon and it's also called villa market not mart. Not really very clear to be honest. Especially to a non-chalongian.

Link to comment
Share on other sites

It is related to the underpass construction to install new drainage prior to the big event. Nearly 2 months so far & not looking like it will be completed very soon & probably have to do the other side as well. No sign of alternative roads being built which was listed as part of the works. Only existing narrow sois. Widening the approaches to the circle would help while the underpass is being built but cannot see that happening.

Link to comment
Share on other sites

It is related to the underpass construction to install new drainage prior to the big event. Nearly 2 months so far & not looking like it will be completed very soon & probably have to do the other side as well. No sign of alternative roads being built which was listed as part of the works. Only existing narrow sois. Widening the approaches to the circle would help while the underpass is being built but cannot see that happening.

They said that the drains was going to be complete in 20 days.

I love their optimism.

Link to comment
Share on other sites

It is related to the underpass construction to install new drainage prior to the big event. Nearly 2 months so far & not looking like it will be completed very soon & probably have to do the other side as well. No sign of alternative roads being built which was listed as part of the works. Only existing narrow sois. Widening the approaches to the circle would help while the underpass is being built but cannot see that happening.

They said that the drains was going to be complete in 20 days.

I love their optimism.

Money can't flow fast enough.

Link to comment
Share on other sites

Went past at 2:00 this afternoon. A grand total of four people working! There weren't a lot more at 5pm yesterday evening. There doesn't seem to be any urgency at all. And what are the odds that when the drainage work is eventually complete, the road remains untarmacked for months afterwards.

Link to comment
Share on other sites

The new drains will be installed for at least two kilometres on each side of the road, he added.

“Workers will block off sections of 120 metres at a time to install drains. Each section is expected to take 15 to 20 days to complete,” Mr Chalermpol said.

Work on the much debated Chalong Underpass is likely to start in September 2015, and if not complete by September 14, 2017, Civil Engineering Co.Ltd, the construction company who won the tender to construct the underpass, will be fined around B1.3 million.

So will be ready at 2018

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.







×
×
  • Create New...