Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Pattaya tunnel - unveiling confirmed for August 25th!

Featured Replies

Pattaya tunnel - unveiling confirmed for August 25th!

 

20882651_1962671510670977_948213222206345167_n.jpg

 

After rumors that the Central Pattaya road tunnel was once again to be delayed comes confirmation that it will open as planned on August 25th.

 

The government communications minister will be at the resort to do the proud unveiling. A schedule for the big day was announced by Rao Rak Pattaya today.

 

Akhom Termphitayaphaisit will arrive at 2pm and after speeches will finally unveil the tunnel at 3.10pm local time.

 

The 800 million baht plus project has been dogged by delays and repairs but now looks set to finally open to traffic.

 

Source: https://www.facebook.com/welovepattaya58/posts/1962671594004302

 
tvn_logo.jpg
-- © Copyright Thai Visa News 2017-8-14
  • Replies 76
  • Views 6k
  • Created
  • Last Reply

Top Posters In This Topic

Posted Images

Don't hold your breath!

Just now, alocacoc said:

Don't hold your breath!

...unless you get trapped in the tunnel when it gets flooded.

...unless you get trapped in the tunnel when it gets flooded.
That was a good one. [emoji1]

Sent from my SM-G900F using Tapatalk

This is just a smokescreen to be transmitted live around the whole Kingdom to divert the public's attention away from the real event of the day - Yinglucks freedom :passifier:

2 hours ago, NanLaew said:

...unless you get trapped in the tunnel when it gets flooded.

I think it is likely to happen. The violent thunderstorms bring plenty of water from September through November. That will be the real test for the tunnel.

Just now, Thunder26 said:

I think it is likely to happen. The violent thunderstorms bring plenty of water from September through November. That will be the real test for the tunnel.

I was joking.

 

Oh... so are you!

36 minutes ago, NanLaew said:

I was joking.

 

Oh... so are you!

I'm being serious :)

hard to believe that some still continue to joke the tunnel will flood despite being told multiple times the reason why that is impossible

This has probably been covered before, but............ what is the tunnel intended to achieve?

 

A serious question because I really can't how it will benefit the flow of traffic

2 hours ago, Golden Triangle said:

This is just a smokescreen to be transmitted live around the whole Kingdom to divert the public's attention away from the real event of the day - Yinglucks freedom :passifier:

Don't you mean the 20th Miss Tiffany final?

They need to get it opened to coincide with the commencement of road works on the main artery into Pattaya required by the burying underground of electrical cables.... currently above ground, in some locations, only just.

9 hours ago, Jip99 said:

This has probably been covered before, but............ what is the tunnel intended to achieve?

 

A serious question because I really can't how it will benefit the flow of traffic

It will be a great improvement over the traffic flow during the 3 years of construction and hence commendable.

20 minutes ago, jacko45k said:

It will be a great improvement over the traffic flow during the 3 years of construction and hence commendable.

 

 

....and compared to just before work started......?

 

 

I can see that it will get more traffic, more quickly to the northbound traffic lights at Pattaya Tai and the southbound lights at the 7 intersection....... beyond that?

12 hours ago, Thunder26 said:

I think it is likely to happen. The violent thunderstorms bring plenty of water from September through November. That will be the real test for the tunnel.

If it does flood then, the official response will be it is only because of the unsually heavy rains, the ones that fall each year at that time.

1 hour ago, Jip99 said:

 

 

....and compared to just before work started......?

 

 

I can see that it will get more traffic, more quickly to the northbound traffic lights at Pattaya Tai and the southbound lights at the 7 intersection....... beyond that?

Help gridlock Pattaya central road..!!

Hope the opening will get some traffic out of the Darkside although there's still the Soi SCC mesh going on ... so maybe have to wait a little longer.

As Mentioned before ,they do not say what year .

2 hours ago, 1duckyboy said:

If it does flood then, the official response will be it is only because of the unsually heavy rains, the ones that fall each year at that time.

How right you are!

Of course the annual rainy season is to blame, never the architects. 

I won't be holding my breath for this to open on 25th. If it's ready now, why wait? 

Is it mere coincidence that as I view it, this page advertises a dive company and the Ramayana water park? 

Does somebody know the same thing the rest of us do?

6 hours ago, Jip99 said:

 

 

....and compared to just before work started......?

 

 

I can see that it will get more traffic, more quickly to the northbound traffic lights at Pattaya Tai and the southbound lights at the 7 intersection....... beyond that?

Oh probably no impact whatsoever, just less queuing at Klang and worse at Tai and Nua.

17 hours ago, Chivas said:

hard to believe that some still continue to joke the tunnel will flood despite being told multiple times the reason why that is impossible

My sentiments exactly .. The sayers of nay have yet to be convinced by the power of prayer here .. And in the days leading up to the great occasion the power of prayer will be ramped up not unlike the national grid does with the electric when everyone puts the kettle on during H/T in the soccer .. The spike will be noticeable and in view of that I have no doubt everything will be alright on the night .. But it might help if the rain stayed away also or at least until after the event .. :sad:

When using the tunnel are we allowed to disconnect our seatbelts when wearing lifejackets????

 

On 8/14/2017 at 10:28 PM, Thunder26 said:

I'm being serious :)

You can't be.

On 8/15/2017 at 8:19 AM, Jip99 said:

 

 

....and compared to just before work started......?

 

 

I can see that it will get more traffic, more quickly to the northbound traffic lights at Pattaya Tai and the southbound lights at the 7 intersection....... beyond that?

Beyond the flood or not flood debate, right now that is ALL that the tunnel will offer; about 8 to 12 seconds quicker transit between the Thai and Nua traffic lights. Week days should be better, weekends marginal but for national holiday weekends not a ha'pennyworth of difference.

 

A good time to assess the full efficacy of the tunnel will be some time in 2018 when the Highway 7 extensions and bypasses are all up and running and most traffic to/from Bangkok and the eastern seaboards industrial estate suburbs to/from south of (roughly) Ban Amphur will not be trucking up and down the bit of Sukhumvit that passes Pattaya.

 

On a brighter note, I do predict that the traffic lights at Theprassit/Sukhumvit/Khao Talo will still be an enduring nightmare.

Edited by NanLaew

I'd be curious if the end result is any noticeable difference. It seemed to small to me to make a difference, but I do not drive so might be missing something.

 

on the plus side, I don't drive so I don't worry about traffic or flooding

In order to further streamline the traffic flow into Pattaya,will the local administration be planning to synchronise the opening of the tunnel with a grand opening of the toll gates--just a thought.

 

What toll gates ?

3 minutes ago, johng said:

What toll gates ?

 

 

On the 7.

 

 

But there's a thought......stick a toll on the underpass ?

I live very close by the tunnel and I'll be there on the 25th with my best shirt on holding banner and flowers cheering with the crowd as the ribbon is cut.

 

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.