Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Long-overdue Second Road repaving begins

Featured Replies

Long-overdue Second Road repaving begins

n6surfaces.jpg

PATTAYA:--Having deteriorated to the point where it more resembles the surface of the moon than one of Pattaya’s main thoroughfares, Second Road finally is getting repaved.

Long-overdue resurfacing work began Sept. 15 at the south end of the street, with workers closing just a single lane to prevent downtown from going into total gridlock.

Work will be done in 300-meter-long chunks, with each lane dug up, leveled and resurfaced, hopefully with enough reinforcement that the frequent floods that led to the current dilapidation don’t force another repave anytime soon.

Pattaya officials optimistically estimated that contractors Norbrick Co. will have the entire length of Second Road complete by Oct. 4.

- See more at: http://www.pattayamail.com/localnews/long-overdue-second-road-repaving-begins-41443#sthash.1Tc6poDJ.dpuf

pattayamaillogo.png
-- Pattaya Mail 2014-09-26 footer_n.gif

Arnold Judas Rimmer of Jupiter Mining Corporation Ship Red Dwarf

In the OP it says this

Work will be done in 300-meter-long chunks, with each lane dug up, leveled and resurfaced

To me it seems that they already have the whole stretch dug up.

I walked yesterday from Central (Soi 9) to Big C (Soi 3) and that whole stretch was already dug up, so it seems they are trying to do the whole 2nd Road in 1 Go.

Just drove from a bit south of Central Festival up to Big C, all dug up and a huge muddy mess.

Complete by October 4?

What year???

19 days from start to finish. Wow. That's a bit hopeful.

19 days from start to finish. Wow. That's a bit hopeful.

Not the way they'll do it.

Yet another major road repair during the rainy season. I saw this up in Bangkok many times and the mess was unbelievable. Is there a reason for not doing this work during the dry or hot seasons?

<script type='text/javascript'>window.mod_pagespeed_start = Number(new Date());</script>

Yet another major road repair during the rainy season. I saw this up in Bangkok many times and the mess was unbelievable. Is there a reason for not doing this work during the dry or hot seasons?

Yes. Sensibility cheesy.gif

  • 4 weeks later...
  • Author

Troll post removed

Arnold Judas Rimmer of Jupiter Mining Corporation Ship Red Dwarf

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.