Jump to content

BTS tests Green Line trains at 7 new stations before public opening at year-end


Recommended Posts

Posted (edited)
1 hour ago, mwbrown said:

Which of these stations will have a walkway into Don Mueang airport?

Extension stations 3, 4, 5 and six 6 run parallel to the airport, but from what I’ve seen on google maps none of them have a walkway connection to the airport. Your best bet is to get off at station 6 at the northern end of the airport because it’s very close to Thupatemi Rd/Chanthrubeksa Rd that runs along the airport area and take a taxi there. The coordinates of the station are 13.9250437, 100.6258178

Edited by pacovl46
Posted

None of these stations will have a walkway to Don Mueang airport. The green line is on the BTS system, which runs up the Pahonyothin Rd side of the airport.

I think the stations that you are thinking about are on the SRT red line (I think), which runs along-side Vipharvadi/Rangsit Rd. This line won't open for some time.

If you want to get to the airport from the BTS green line, get off at Kor Por Aor station and get a short taxi ride, around 50bht.

  • Like 1
Posted
On 10/7/2020 at 8:56 PM, mwbrown said:

Which of these stations will have a walkway into Don Mueang airport?

As others have mentioned, the green line doesn't pass by DM.  The red line does and will be connected by a walkway - should open mid 2021.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...