Whiskey Franchise
-
Recently Browsing 0 members
- No registered users viewing this page.
-
Topics
-
Popular Contributors
-
Latest posts...
-
0
Hungry American Nabbed After Robbing Donation Box in Pattaya
Hungry American Nabbed After Robbing Donation Box in Pattaya A 62-year-old American man named John was arrested in the early hours of April 2 for breaking into a donation box outside a Pattaya police station. Claiming hunger after losing his ATM card, he used a stone to force open the box belonging to the Father Ray Foundation, stuffing cash and coins into his wallet. Police caught him in the act and have initiated legal proceedings. While his desperation may evoke sympathy, the theft from a charitable cause shocked locals and tourists alike, underscoring the serious consequences of such actions. -
25
French Tourist in Critical Condition After Zebra Crossing Accident
If Zebra crossings pedestrians haven't got right of way on the road then whats the point of having them? F*** Thai drivers. -
44
1 baht street water machines - do they have filters?
I have used this type of machine for 8 months, never checked, never had any issues -
4
Chiang Mai Battles Severe Air Pollution Amidst Persistent Wildfires
So, just another typical day in Chiang Mai. Ok, noted... Thanks -
25
Australian Teen Dies in Koh Samui Motorbike Collision
Did you pay for your empathy bypass privately, or did insurance cover the cost. A young lad has lost his life, what on earth is wrong with you ? (rhetorical) -
12
Thailand’s Earthquake Damage: 34 Buildings Deemed Unsafe After National Checks
International standard is visual !! Following an earthquake, inspections of quake damage involve a two-phase process: a rapid assessment to identify safe and unsafe buildings, followed by a detailed inspection to determine the extent of damage and necessary repairs. Here's a more detailed breakdown of the inspections: 1. Rapid Assessment (Initial Phase): Purpose:To quickly identify buildings that are obviously safe (no damage) or obviously unsafe (high risk of collapse). Method: Teams of structural engineers or trained inspectors conduct a visual assessment of buildings, looking for major structural damage, potential hazards, and signs of instability. Outcomes:Buildings deemed safe are marked as such and may be re-occupied Buildings deemed unsafe are marked as such and may be closed off to prevent further casualties. Buildings with uncertain safety status are marked for detailed inspection. 2. Detailed Assessment (Second Phase): Purpose: To determine the extent of damage and the necessary repairs or interventions. Method: Structural Assessment: Engineers conduct a thorough inspection of the building's structure, including walls, floors, roofs, and foundations. Building Systems Assessment: Inspectors assess the condition of building systems such as plumbing, electrical, and HVAC. Damage Identification: Any damage, including cracks, structural issues, or compromised building systems, is identified and documented. Recommendations: Engineers provide recommendations for repairs, strengthening, or demolition, as need Outcomes:Buildings are assessed for their usability and safety. Recommendations are made for repairs, strengthening, or demolition. Appropriate postings (e.g., "SAFE," "LIMITED ENTRY," "UNSAFE") are placed on the building to inform the public.
-
-
Popular in The Pub
-
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now