Jump to content

Sudden decision to change criteria for MRT bid infuriates BTS


snoop1130

Recommended Posts

Sudden decision to change criteria for MRT bid infuriates BTS

By THE NATION

 

800_6583c4b73fb0b3f.png

 

The Bangkok Mass Transit System (BTS) is threatening to go to court after Mass Rapid Transit Authority (MRTA) changed its evaluation criteria for bids on the MRT Orange Line.

 

Surapong Laoha-Unya, chief executive officer of BTS, one of the bidders for the MRT Orange Line which runs from Bang Khun Non to Min Buri, said MRTA’s recent decision to change the bidding criteria is unfair because the change was announced after bidding papers were sold to bidders.

 

MRTA decided that instead of basing 100 per cent of the evaluation on bidders’ technical proposal, it would base 30 per cent of the evaluation on technical proposal and 70 per cent on the price proposed.

 

So far, 10 companies have bought bidding envelopes for this Bt142.7 billion project, namely Bangkok Expressway and Metro, Bangkok Mass Transit System, BTS Group Holdings, Sino-Thai Engineering and Construction, Italian-Thai Development, Ratch Group, Ch Karnchang, Gulf Energy Development, Sinohydro Corporation and Woranitath Development.

 

The project comprises the construction of a 13.4-kilometre track from Thailand Cultural Centre to Bang Khun Non stations as well as the installation and operation of a train system for the 35.9km from Min Buri to Bang Khun Non.

 

“We have filed an appeal with the State Enterprise Policy Office and MRTA board of directors to demand justice, as nothing like this happened in the past,” he said. “We are also thinking of taking this to court, but if in the end, the authorities say this change in criteria is within the law, then BTS will enter the bidding.”

 

Surapong also said the company is waiting for the Cabinet to approve the extension of its concession for the newly extended Green Line.

 

“Once the contract is signed, BTS will start adjusting the fare structure to a maximum of Bt65 for the line, while its extension from Lat Phrao to Khu Khot should be open to public within December,” he added.

 

Source: https://www.nationthailand.com/news/30394646

 

nation.jpg

-- © Copyright The Nation Thailand 2020-09-16
 
Link to comment
Share on other sites

11 hours ago, snoop1130 said:

MRTA decided that instead of basing 100 per cent of the evaluation on bidders’ technical proposal, it would base 30 per cent of the evaluation on technical proposal and 70 per cent on the price proposed.

Never mind the quality - Feel the width .........LOL

Link to comment
Share on other sites

13 hours ago, snoop1130 said:

“We are also thinking of taking this to court, but if in the end, the authorities say this change in criteria is within the law, then BTS will enter the bidding.”

This is easy to figure out: who has more Generals on the board, MRT or BTS...

  • Haha 1
Link to comment
Share on other sites

15 hours ago, snoop1130 said:

So far, 10 companies have bought bidding envelopes for this Bt142.7 billion project, namely Bangkok Expressway and Metro, Bangkok Mass Transit System, BTS Group Holdings, Sino-Thai Engineering and Construction, Italian-Thai Development, Ratch Group, Ch Karnchang, Gulf Energy Development, Sinohydro Corporation and Woranitath Development.

In those Envelopes is there a notice that If they Donate a Certain Amount or a higher amount that they are number One on the List for the Big Contract .

Link to comment
Share on other sites

16 hours ago, snoop1130 said:

So far, 10 companies have bought bidding envelopes for this Bt142.7 billion project, namely Bangkok Expressway and Metro, Bangkok Mass Transit System, BTS Group Holdings, Sino-Thai Engineering and Construction, Italian-Thai Development, Ratch Group, Ch Karnchang, Gulf Energy Development, Sinohydro Corporation and Woranitath Development.

 

3 hours ago, klauskunkel said:

This is easy to figure out: who has more Generals on the board, MRT or BTS...

 

So far, I would bet on Sino-Thai. 

 

Edited by Flying Saucage
  • Like 1
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.




×
×
  • Create New...