Jump to content

MJCM

Advanced Member
  • Posts

    13,136
  • Joined

  • Last visited

Everything posted by MJCM

  1. This is not about sad and confused (isn't that a Led Zeppelin song ???? ) it's about the Laugh one which is also not there anymore
  2. Yeah that will increase the size of the Jokes thread ???? Every joke follows with tens of replies with ????
  3. First the sad or puzzled emojis have been removed and now also the Laugh emoji is gone. The only ones left are Thanks and Like Whatsup? ????
  4. I think you should read this I always order COD, but it wasn't available for this one!
  5. I will DO DO DO that from now on as well ???? So now 2 things to ask the Vendor 1- Is the item REALLY in stock? 2- Which shipping Company you use to send the stuff
  6. And this order was the first order (this year) that I did not do COD because it was not available ???? and it failed ????
  7. They owed me 1930 THB because of the seller (in China) not knowing that the product I ordered from them was out of stock. ???? Normally I pay via COD, but this time COD was not available, so I used my Credit Card. Order cancelled on Saturday and received the money back in my account the following week on Tuesday. This is what the Customer Service send to me
  8. Sorry, just curious! Edit: Maybe could be interested in 1.
  9. I wonder what you paid for it?
  10. They are noisy (those drones) very high pitched. Our house is 60 meters away (straight line) from our PEA meter and we most certainly would hear them, but as you said the likelihood of them being used is remote especially in the sticks.
  11. Nice. So now (next week) 20kW ESS. What was the price of the (new) 10kW ESS. 95k I recall? How far do you discharge the ESS?
  12. No idea as it was constructed in 2020 same as the digging of the lake and the "klong" but it was a lot of columns and a couple 100m of Barbed wire.
  13. Nicely done. If you go to https://eservice.pea.co.th/EstimateBill/# and select September 2022 (till December 2022) the Ft rate there has already been updated to 93.43 Satang/kWh, but the Estimate on the site doesn't take in consideration the "promised" discount ????
  14. We are not talking car batteries here if you want them to last. Just an Example https://www.lazada.co.th/products/12v-24v-48v-200ah-battery-lifepo4-lithium-iron-phosphate-i3381790204-s12503422969.html? 87k for 48V 200Ah which would give you approx 9.6 kW but because you want to be nice to a Battery you would only use approx 4-5kW out of it to make it last longer. So just for my wifes Garden Pump, Inverter, Solar Panels, Battery, cables etc 200k (excl installer) Batteries are (AFAIK) the biggest expense in a Solar Install, BUT if you can do without them, for example in only Day time use (which we CAN NOT for this PUMP) you are talking a a lot cheaper (because you cut out the Battery).
  15. Not possible without a Major Investment. Because my Wife wakes up at around sunset, drinks a coffee and is into the garden and that time No Sun that is of any strength is out. Same in the evening (She comes into the house around 7-8pm (I told you she is a garden NUT). So this would require a BIG BIG battery. (and they are not cheap) Own "lake" used to raise fish and in the dry season fed by a Submersible Deep Well Solar pump ????
  16. Water Bill = Free using a Solar Pump from a "Lake" behind the property to Fill the 4000 Liter holding tank. (and that gets filled every day) Wife uses a 750W pump 2-3 hours in the morning and 2-3 hours in the evening (she is a garden NUT) for the garden. Edit: Before we got the Solar Pump we used a 2HP pump to pump water from the Gov Lake in front of the house to the Holding tank and then our PEA usage was reaching almost 500 units a month. So the Solar Pump brought that RIGHT down.
  17. TiT Our Bill will arrive on the 15th, but we are heading for an ultimate low bill since we live in this house (2020). Normal usage is around 11kWh a day, but because of the rains we are only at 6-8kWh. (We have a big garden (3 Rai) and thus no need to water plants)
  18. Read here https://aseannow.com/topic/1269638-household-electricity-users-to-get-discounts-from-september-to-december/
  19. I read that as well there is some kind of rebate in place. less then 300 you got the highest discount But can't find the topic at the moment But as TiT we have to wait and see what really happens. Edit: Found the Topic https://aseannow.com/topic/1269638-household-electricity-users-to-get-discounts-from-september-to-december/
  20. Also check via this! https://www.dnsleaktest.com/ And do the Standard / Extended test if only your VPN providers DNS is listed.
  21. That Vehicle access could be anywhere. Why? Because in the Rice Harvest season they uses Rice Field dividers to cross from 1 field into another and they don't care if there is a Power Cable hanging a bit low ????
  22. Do you also use a VPN all the time, because NOT connecting through a VPN will expose your REAL IP Address which is logged via your Internet provider and then the police can easily find you even you using a Fake Name on Forums or FB or Blogs!
  23. again do please read this The keyword here is 3 weeks at a time. Under consideration period is 30 days minimum (if going for the Marriage extension). I had to wait one time 41 days. From January 6th - 17th February and this was pre-covid. Edit: And if he would go for his 1st Extension, there would also be home visits. Not sure if he can make that in those 3 weeks he is only here.
  24. MJCM

    Truck of soil

    You could ask any local Garden centre for starters.
  25. Yes but the only thing the local IO does is check if the Documents are correct, if so then the documents get send to Regional HQ for approval. Regional HQ will make the final decision, not your local IO! That is why you get a "under consideration stamp" in your passport. The decisions can take up to 30 days to come back from the HQ (my longest wait was almost 45 days)
×
×
  • Create New...