Jump to content

Sukhumvit Road closures set for Sept. 2-6


Recommended Posts

Posted

Sukhumvit Road closures set for Sept. 2-6

image.png

PATTAYA:--Part of Sukhumvit Road and the Central Road bypass tunnel will be closed intermittently from Sept. 2-6 to allow for construction of a wheelchair-accessible pedestrian bridge.

 

The long-delayed project will hit a major milestone next month when a 400-ton crane truck anchored on the traffic island lifts the 80-ton, 43-meter-long prefabricated superstructure onto supports on each side of the busy highway by the Redemptorist School for Persons with Disabilities. The bridge, equipped with elevators on each side, is expected to open at year-end.

 

Engineers also will use the period to remove the old bridge in front of Pattaya School No. 5.

 

From Sept. 2-6, the southbound side of the Central Road bypass tunnel will be closed from 7 p.m., although the surface-level parallel road will remain open.

 

Read more: http://www.pattayamail.com/news/sukhumvit-road-closures-set-sept-2-6-219925

 
pattaya_mail_logo.jpg
-- © Copyright Pattaya Mail 2018-08-25

 

"Smoke me a kipper, I'll be back for breakfast!"

Arnold Judas Rimmer of Jupiter Mining Corporation Ship Red Dwarf

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...