Bangkok Building Collapse Blamed on Design Flaws, Says PM


Recommended Posts

Posted

I believe the notion that the original building design was flawed and/or the actual construction of the building didn't follow what the original design called for.

 

However, I DON'T believe that all the prior, pretty substantial reporting and testing of the construction materials that found substandard steel and substandard concrete being used was somehow all totally in error. As i recall, some of those findings were made based on testing done and publicly reported by Thai government entities, among others.

 

Especially given that the latest news reporting here and the PM's comments don't give any explanation at all of what happened with the prior public reporting of substandard construction materials being used.

 

Thai police general heading the investigation, BKK Post, June 9:

 

"We have evidence of forged engineering signatures, substandard materials and violations of basic safety standards.

 

The cement and steel used, to give one example, didn't meet the specifications outlined in the contract's terms of reference." [emphasis added]

...

There are clearly three core failures: design, supervision and construction materials. All contributed to the building's collapse and the resulting deaths."
 

https://www.bangkokpost.com/thailand/general/3045011/suspect-list-grows-as-state-audit-office-building-probe-widens

 

 

  • Thumbs Up 1
Posted

Poor material and poor construction would more likely be the case. Designs have to be approved prior to construction starting. If the drawings were wrong, which I don't really believe, then the approvers (usually more than one has to approve a construction drawing), then those that approved them are also guilty.

Posted
20 hours ago, ozz1 said:

Don't want to upset the Chinese masters about their inferior steel reinforcement what a joke

 

You hit the nail directly on the now-buried head.

 

I'm prepared to believe the design was poor and/or poorly implemented but have absolutely no doubt that some of the materials were sub-standard as well.

 

I've bought enough Chinese products here (as if I had any practical choice) to know how they roll.

Posted

Marvelous they discovered building flaw I guess when you have Chinese building stuff and passing our brown envelope so they don’t get it inspected it is business as usual TIT

Posted
12 hours ago, tomazbodner said:

Let's not forget another warehouse collapse in Chonburi, using same sub-standard steel, from factory that was shut down for producing substandard steel. Is this just to redirect attention from the high speed train link to China also using same steel?

How do you know there was substandard steel used at the Project?
Where were the test results published? Do not confuse rumour or suspected issues with fact.
The article clearly states "Contrary to earlier reports suggesting substandard materials, the study confirmed that the steel and concrete used met necessary standards. "
what knowledge do you have of the high speed train project to make any statements that the same "substandard steel" was used?
I know for a fact that the reinforcing steel for the thai high speed rail contract by the same construction company was tested and all found to be within standards. Samples were taken and tested very shortly after the collapse.
Credit to the Thai companies who acted quickly to alleviate any concerns.
Unless you have facts, do not create fiction out of something you do not know.

Posted
8 hours ago, TallGuyJohninBKK said:

Thai police general heading the investigation, BKK Post, June 9:

 

"We have evidence of forged engineering signatures, substandard materials and violations of basic safety standards.

 

The cement and steel used, to give one example, didn't meet the specifications outlined in the contract's terms of reference." [emphasis added]

...


The article states "highlighting that the disaster was not due to material quality."
I am not criticising your opinion contradicting that, but would be grateful to know what information or test results you have to know whether the materials were ok or not?
So this Pol Maj Gen understood the specifications and had the results? Or was stating an opinion on steel reinforcing rumours without the facts. How do you know.
I personally think the fault was in design or not being constructed in accordance with requirements, or a combination of both. 
One of the videos shows clearly that the "concrete" in the bottom columns failed in shear well above the base which indicates something that should not be expected due to substandard reinforcing. IMHO, the reinforcing should have failed not the concrete and thats not what I see on the video.
I am a chartered civil engineer and have done enough designs to seismic codes to have an opinion.
I also know that steel reinforcing from the same contractor JV used on a high speed rail contract was sampled and tested independently within a number of days and found to meet standards.
The concrete would have been from a Thai ready mix plant and records are all well documented as in any western country. So it would take a lot of effort to falsify them.
I do not see any reason for the authorities to lie about the standard of materials, as being implied by some people. This may be Thailand, but testing records after the incident would have to be falsified, and i do not see people taking that risk when this is such a prominent case.
This has yet to go to court for trials of the individuals and we may (or may not ) find out more then.

 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...