Jump to content

MJCM

Advanced Member
  • Posts

    13,133
  • Joined

  • Last visited

Everything posted by MJCM

  1. I keep all the dates re: Immigration 90 Day Reports and the last one I did it on 10th July and it's due on Sat 7th October. And that date (7th October) is stamped into my passport Edit: This is NOT online (as Online doesn't work for me) but by going to Immigration.
  2. You add 89 days from the starting date, as the arrival date (or last report date) is Day 1 (This is even so if you get stamped into Thailand (for example) at 23:59)
  3. 555555555555 In that quoted post there is a mistake in my post which I later (after you posted) changed. The error is (in the first line) 1-1 which you wrote and I quoted it to BenZ changed it to 70% My bad. In my home country, people sometimes have to pay to feed-in (YES you read that correctly), because there they use fluctuating energy prices and sometimes it's even negative. I am in the process (longer term planning though) is to get enough Batteries in (around 30-40kW) to be a bit autonomous, but that SAID we well NOT discard our PEA line. For example we wired our install that certain points (like the 8kW water heater and a plug for welders) are directly connected to the PEA and thus bypass solar completely. So we will still receive a bill from the PEA for when we use those. Also when we have our Batteries in place we will stop exporting (read: Spinning the Meter backwards). Hopefully soon, the first part, a 10kW Battery pack will be in place, and we will expand gradually. I could go the full nine yards by getting the full 30kW Pack, but the controlling/deciding/hampering factor is SWMBO (Someone said to me. slowly slowly catch a monkey and that is what I am doing )
  4. but your 70% isn't going to happen also, because Thailand is one of those countries where it (seems) is very hard to be able to feed-in. One member on here is already waiting for well over a year to be able to feed-in and he has done everything by the book and used an approved installer. And PEA has even come over to his property several times already (and he already paid the money for the approval etc etc) Just look up threads from the member @Thaifish (Ps: Did I mention he is from Buriram as well??) Edit: Found a topic from last Feb
  5. same here, and my install is on the wall (and the next set of panels will on a flat part of our land just outside the wall, which you can see on the right.
  6. ssshhtttttttt But don't get caught spinning your meter backwards (or going into negative meter readings) or you will be stuck with a digital meter, which (AFAIK) will charge you for Export.
  7. Talk to @KhunLA maybe his installer has what you want, but AFAIK he is from HuaHin but does projects all over Thailand
  8. Have fun doing that. Just go online and buy direct from the manufacturer. I am doing the same with my new Inverters (Hybrid one and On-Grid (grid-tie) one). It is also a learning experience. If you buy direct from the Manufacturer ask if they have a Direct Line to Thailand for Shipping, in that case it could cut costs for customs etc etc Ps: I am in Buriram as well.
  9. I found one, but I am surprised they are so cheap 700THB(ish) https://www.lazada.co.th/products/yqk-70-hydraulic-clamp-4-70-sqmm-hydraulic-crimping-pliers-i1826820163-s5495794451.html
  10. Found the link, in your other thread. Updated my post. Still Wish it was that cheap 555555555555
  11. Wow that is cheap. Edit: Different price (from your other thread)
  12. This is happening in some countries in Europe already since a couple of years, I think one of my Banks in Europe started doing this in 2016 already.
  13. What crimping tool can you recommend for 25mm² cable, we have lots of NYY 25mm² from the House Build left and want to use that for the Batteries.
  14. I think in the last week since (Tuesday) we had about a dozen emails back and forth. I am not making any changes. Only in the Settings (on the inverter) turning on or off Anti-Reflux. That is it.
  15. They know, they supplied the NEW firmware but I am still waiting for a new Manual.
×
×
  • Create New...