Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Cracks appear in new Bali Hai Pier floor

Featured Replies

Cracks appear in new Bali Hai Pier floor

 

image.png

 

PATTAYA:--Was it planned obsolescence? Shoddy workmanship? Or just poor luck? The 800 million baht Bali Hai Pier development is already showing cracks, just seven months after it was completed.

 

The area, once a sloppy parking lot for trailered boats, was refurbished last year as a showpiece for the November 2017 International Fleet Review. A close inspection June 1 showed the beautiful new pavements have begun to crack under the heat of the sun.

 

Gone are the cameras and the limelight, gone are the top naval officials from all those important countries, what’s left are the thousands of tourists pouring through the area every day on their way to Koh Larn and back again.

 

Day to day wear and tear seems to be taking its toll. City hall has been notified, but so far, no repairs have been forthcoming.

 

pattaya_mail_logo.jpg
-- © Copyright Pattaya Mail 2018-06-09

Arnold Judas Rimmer of Jupiter Mining Corporation Ship Red Dwarf

  • Replies 40
  • Views 2.8k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

  • TallGuyJohninBKK
    TallGuyJohninBKK

    Apparently, they used the same designers and contractors for the pier project as had previously been used for the runways construction at Suvarnabhumi.... 

  • Whose got September, 2018 in the pool for the first tourist to fall through?    I'd like that square if nobody has it yet.      

  • AhFarangJa
    AhFarangJa

    Standard practice..........Do an inferior job and you are guaranteed more work in the future making repairs........and the wheels go round....

Posted Images

  • Popular Post

Whose got September, 2018 in the pool for the first tourist to fall through? 

 

I'd like that square if nobody has it yet.

 

 

 

3 minutes ago, impulse said:

Whose got September, 2018 in the pool for the first tourist to fall through? 

 

I'd like that square if nobody has it yet.

 

 

 

Mmmmm .....  I remember seeing the cracks in the Tak dam that was widely reported in the Thai news some years ago......I reckon the dam will go before the new pier - but September seems a fair bet that somebody is gonna get an unwanted soaking.....

  • Popular Post

Apparently, they used the same designers and contractors for the pier project as had previously been used for the runways construction at Suvarnabhumi....  :cheesy:

Perhaps there was some skimming off the top a propos the number of cement bags?

9 minutes ago, mikebell said:

Perhaps there was some skimming off the top a propos the number of cement bags?

...Or the size and number of rebars.....?

My goodness and that beautiful Bali Hai  park maybe crack too.

3 minutes ago, Destiny1990 said:

My goodness and that beautiful Bali Hai  park maybe crack too.

Nothing beautiful about it at all.   just a big slab of concrete painted blue !!!!!!!!!!5ae14ff3ed1f0_P_20180408_101517(Large).jpg.7d6c7d156522e75ed8e0f5c06135168b.jpg

Huge swathe of concrete !!!

1974190534_P_20171007_142508(Large).jpg.989c73c2a36bceb914db0c40cd6af392.jpg

Famous last words of the guy in charge of the refurbishment to his workers on the day of completion: "Stay on guard, don't turn around, or get your eyes off our masterpiece,- it may fall apart every minute!"

2009

IMG_1305.thumb.JPG.bcc8ff8e60ef148f1e703e0af3238478.JPG

37 minutes ago, johng said:

Nothing beautiful about it at all.   just a big slab of concrete painted blue !!!!!!!!!!5ae14ff3ed1f0_P_20180408_101517(Large).jpg.7d6c7d156522e75ed8e0f5c06135168b.jpg

It was meant sarcastically that Bali Hai Park is the ugliest park ever.(with or without cracks)

Edited by Destiny1990

Was it planned obsolescence? Shoddy workmanship? Or just poor luck?

 

My bet it will be blamed on the tourists....  

32 minutes ago, drgoon said:

Was it planned obsolescence? Shoddy workmanship? Or just poor luck?

 

My bet it will be blamed on the tourists....  

Of course it will !  The excuse will be that there were too many tourists who were walking heavily !  Or jumping up and down in frustration cos their boat hasn't arrived.

1 hour ago, johng said:

Huge swathe of concrete !!!

1974190534_P_20171007_142508(Large).jpg.989c73c2a36bceb914db0c40cd6af392.jpg

This could have been a nice big beach area!

Roll another inch of tarmac over the top and it's sorted.

  • Popular Post

Standard practice..........Do an inferior job and you are guaranteed more work in the future making repairs........and the wheels go round....:whistling:

How many times after major construction the work deteriorates after a few months and is left in a state of disrepair for months afterwards . Apparently there must be no guarantee required for government  building contracts  

Typical Thai construction.  Build it as cheap as possible, then make tons of money in the repairs.  I remember when they widened 1317 her in Chiang Mai to 4 lanes.  Told the wife they'd be back inside of a year to patch the cracks and fill in the holes.  Only took 8 months. 

3 hours ago, RotMahKid said:

This could have been a nice big beach area!

would not have had the right kind of sand !!!!!!

So if a really deep hole opened up and a tourist fell into it; would the tourist end up in China ?

 

And the blame is that Global Warming is worse than calculated because of the plastic bags in the ocean.

The usual get it done and make it look nice. We are behind schedule and the regatta is coming in a few weeks.

Good opportunity here to start all over and this time do something a lot nicer, more inviting, more people-oriented, and, yes, with some shade.

Stick some trees in the cracks problem solved.

6 hours ago, Destiny1990 said:

Stick some trees in the cracks problem solved.

One last root before you get on a boat eh? Good idea..!!

20 hours ago, johng said:

Huge swathe of concrete !!!

1974190534_P_20171007_142508(Large).jpg.989c73c2a36bceb914db0c40cd6af392.jpg

I don't know how that can be called a pier.  I guess they plan for the usual boring same same bunch of road side shops and stalls to be there?  What a waste of what could be a beautiful seaside area.

31 minutes ago, gk10002000 said:

I don't know how that can be called a pier.  I guess they plan for the usual boring same same bunch of road side shops and stalls to be there?  What a waste of what could be a beautiful seaside area.

What a great Park is that.

34 minutes ago, gk10002000 said:

I don't know how that can be called a pier. 

The long thing going out into the sea with boats moored against it you mean???

 

 

21 minutes ago, Jeremia Juxtaposed said:

The long thing going out into the sea with boats moored against it you mean???

 

 

that part I get.  The part with the blue and white concrete, I don't get.

1 hour ago, gk10002000 said:

that part I get.  The part with the blue and white concrete, I don't get.

Gosh can’t u see that’s the Park...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.