Jump to content

Transport Minister Orders Thorough Check of Thai-Chinese High-Speed Rail


Recommended Posts

Posted
8 minutes ago, johng said:

Hope you got one for yourself too

probly will become a collectors item

must keep the box though.

 

Of course.

 

It still has the factory seals!

  • Thumbs Up 1

"I don't want to know why you can't. I want to know how you can!"

Posted
21 minutes ago, Crossy said:

What nobody has realised yet, is that the model in the photo is what they are getting :whistling:


Only ฿341 Billion THB and this beauty can be yours - today!!!5447735.jpg.3e3908b8857d23a8bb465bbe68a9db8d.jpg.75a242efb2ab51e8c7e849af148c8a5f.jpg
 

  • Like 2
Posted
2 hours ago, Crossy said:

What nobody has realised yet, is that the model in the photo is what they are getting :whistling:

 

Crossy, maybe your memory and knowledge on this is better than mine...

 

But I seem to recall, the SRT's ARL rail line some years back having operational problems because of substandard steel track elements having been used.  And the SRT then having to curtail service for some periods of time while they replaced the original tracking???

 

"Though funding for this work was made available back in 2012 the tender has not been done as one of the problems with the line is that cheap chinese steel (a corruption issue) was used and there has been major problems with track deterioration especially at turn outs - which resulted in speed restrictions a year ago. The whole track will need to be replaced in the next few years."

 

https://www.tripadvisor.com/ShowTopic-g293916-i3687-k7360486-Airport_Rail_Link_express_Phaya_Thai_line_maintenance_work-Bangkok.html

 

https://www.bangkokpost.com/thailand/general/1181893/airport-link-boss-hits-back-over-safety

 

Not an inspiring track record of rail transit when the Thai government is the operator:

 

Airport Rail Link a model of failure

 
THURSDAY, SEPTEMBER 18, 2014
 
"...from the time the Thaksin administration signed the first contracts in 2005 to its official opening in 2014, no one seems to have had any sensible plans for this infrastructure project. Surprisingly, maintenance and safety requirements were not a priority of the existing plan, which also fails to encompass the financial losses.

Everyone behind the project should be held accountable for these failures. They must have known about the running limit of the trains, and that the delivery of spare parts from its maker, Siemens, takes seven or eight months. Such simple facts should not escape capable managers. But, instead, the ARL board’s mishandling of the situation threatens to cause not only safety concerns but also severe inconvenience."
 

https://www.nationthailand.com/perspective/30243536

 

 

 

  • Like 2
Posted

I do wonder about the tracks still being within the precise specifications for the train to operate at "High Speed"

 

It would not look favorable if they have to put reduced speed limits on sections of the track because they are not within the specifications for "High Speed" travel.

  • Like 2
Posted
17 hours ago, snoop1130 said:

mandated a comprehensive review of the Thai-Chinese high-speed train project

Can we assume that it wasn't being reviewed up until the point of the building collapse?  🙂

  • Like 1
Posted

What do you do when the Rama II elevated highway had bits fall off it, but the same contractor continues to work on it. Then the Audit building collapses but in-depth investigations are ordered for another project run by the same contractor.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.



  • Topics

  • Popular Contributors

  • Latest posts...

    1. 12

      Thailand Live Friday 4 April 2025

    2. 565

      Trump Starts Global Tariff Wall, Thailand Hit with 36% Tax

    3. 0

      Armed Robbery at Bang Phli Gold Shop: Suspect Flees with 400000 Worth of Jewellery

    4. 12

      Thailand Live Friday 4 April 2025

    5. 565

      Trump Starts Global Tariff Wall, Thailand Hit with 36% Tax

    6. 0

      Military Truck Overturns After Tyre Blowout in Buriram, Eight Soldiers Injured

  • Popular in The Pub

×
×
  • Create New...