Phuket's B6bn Patong tunnel may start next year, says project chief
Eakkapop Thongtub

1440133465_1-org.jpg
A model shows how the elevated expressway from Patong will enter the tunnel. Photo: Dept Land Transport

PHUKET: -- Construction of the long-awaited B6-billion Kathu-Patong tunnel could well begin as early as next year if the Environmental Impact Assessment (EIA) gets approval, according to Aiyanat Tinapai, Governor of the Expressway Authority of Thailand (EXAT).

Mr Aiyanat held a Tunnel Construction Technology seminar with West Nippon Expressway Engineering Chugoku Co Ltd (Nexco) as well as other consulting companies and engineers for the project at the EXAT headquarters on August 11 to discuss the conclusion to the studies carried out for the tunnel.

“The studies and design for the project have been concluded, and if the EIA study is approved we will move forward with our proposal for the tunnel,” said Mr Aiyanat.

“Should this get the go-ahead, construction will begin around mid-2016 and the project will be complete within five years.

“Once the Kathu-Patong tunnel is open to the public it will certainly help to reduce traffic on Highway 4029,” he said.

The Kathu-Patong tunnel project will be overseen by EXAT and it will the first tunnel to be built in Phuket.

EXAT first proposed the tunnel idea in 2011 and since then have been working to find the best operational ideas for the tunnel and learning new and different construction techniques.

“Nexco is a Japanese company that specialises in constructing expressways and tunnels and has provided us with new knowledge and ideas. They have also shared their experiences with our engineers and other departments involved in the project,” Mr Aiyanat said.

“Nexco engineers have emphasised that safety during construction of the tunnel is their priority. However, high-tech devices such as sensor systems to monitor the movement of the tunnel, smoke detectors and other devices to help monitor traffic flow inside the tunnel will be installed once construction is complete.

“These devices will set off an emergency signal to a control centre if any problems are detected inside of the tunnel,” he added.

A representative from Nexco said that when choosing the construction company that will be in charge of the project, expertise in road and tunnel construction is a must, Mr Aiyanat assured.

“The company must be highly responsible and have a lot of experience. This type of project is risky and likely to have unforeseen incidents, so all works require supervision, should follow risk management guidelines and work discreetly,” he said.

Nexco uses new technology to build curved, instead of straight, tunnels, Mr Aiyanat explained.

“This type of tunnel excavation is very different from that of a subway or canal tunnel which dig through soft soil. But to excavate a hill which has rocks and hard soil a tunnel-boring machine must be used.”

Mr Aiyanat explained that the Kathu-Patong project will use a raised expressway with a total length of 3.98 kilometres.

“The expressway will have four lanes that will start at Phra Meita Rd (off Pang Muang Sai Kor Rd) in Patong. Two lanes will be for cars and two for motorbikes,” he said.

“The expressway will rise above Pisitgoranee Rd to Patong Hill (900 metres) to the tunnel and through the hill (1.85km).

“It has been decided to use two tunnels with the raised carriageway design as this will also reduce traffic in the area and provide convenience to users.

“Toll stations will be located at the end of the raised carriageway in Kathu, where it will join Route 4029,” he added.

Source: http://www.thephuketnews.com/phuket-b6bn-patong-tunnel-may-start-next-year-says-project-chief-53742.php

tpn.jpg
-- Phuket News 2015-08-21

Posted

Must be the joke of the month.

I hear this story about the tunnel already for the last 20 years.

Time to do another feasibility study i think.

Posted

I thought raised roads had to be avoided at all costs because tourists didn't like them.

So it's not ok to build an overpass in the middle of a supermarket area, but a giant raised expressway in the actual holiday resort is fine after all?

Posted

I thought raised roads had to be avoided at all costs because tourists didn't like them.

So it's not ok to build an overpass in the middle of a supermarket area, but a giant raised expressway in the actual holiday resort is fine after all?

It's a bit hard to link a tunnel exiting a mountain with an underpass.

Posted

I thought raised roads had to be avoided at all costs because tourists didn't like them.

So it's not ok to build an overpass in the middle of a supermarket area, but a giant raised expressway in the actual holiday resort is fine after all?

It's a bit hard to link a tunnel exiting a mountain with an underpass.

I see no reason why a tunnel exit need an elevated roadway.

And this makes no sense .... “It has been decided to use two tunnels with the raised carriageway design as this will also reduce traffic in the area and provide convenience to users."

Raised carriageway .... so where is the other traffic going ? I agree with pistachios 'I thought raised roads had to be avoided at all costs because tourists didn't like them.'

Posted

Chances are this will never happen and on the offchance that it does happen, I would never set foot/tire into that death trap having experienced Thai traffic for enough time.

Posted

I thought raised roads had to be avoided at all costs because tourists didn't like them.

So it's not ok to build an overpass in the middle of a supermarket area, but a giant raised expressway in the actual holiday resort is fine after all?

It's a bit hard to link a tunnel exiting a mountain with an underpass.

I see no reason why a tunnel exit need an elevated roadway.

And this makes no sense .... “It has been decided to use two tunnels with the raised carriageway design as this will also reduce traffic in the area and provide convenience to users."

Raised carriageway .... so where is the other traffic going ? I agree with pistachios 'I thought raised roads had to be avoided at all costs because tourists didn't like them.'

OK, another reason.

They couldn't empty all the traffic into Nanai for obvious reasons. The traffic needs to get to one of the wider middle roads. To dig an underpass across a flood prone, over developed, chaotic town and at right angles to the main traffic flow streets would present problems impossible for this mob to solve. Add to that all the self interest groups who would demand huge payouts for the land.

IMO a carriageway would be the only way to disperse the traffic, but obviously you guys think there is no difference between this and the underpasses on the main highway.

Posted

OK, another reason.

They couldn't empty all the traffic into Nanai for obvious reasons. The traffic needs to get to one of the wider middle roads. To dig an underpass across a flood prone, over developed, chaotic town and at right angles to the main traffic flow streets would present problems impossible for this mob to solve. Add to that all the self interest groups who would demand huge payouts for the land.

IMO a carriageway would be the only way to disperse the traffic, but obviously you guys think there is no difference between this and the underpasses on the main highway.

We are just making te point that the authorities have always rejected elevated roadways in Phuket because they are 'ugly'. Naturaly an underpass is impractical, but why even the need for an overpass. Just some thought out traffic planning ....

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...