-
Posts
45,760 -
Joined
-
Last visited
Content Type
Events
Forums
Downloads
Quizzes
Gallery
Blogs
Everything posted by Crossy
-
Meanwhile, Madam being Madam is rescuing stranded fish. These are all now residing happily in the goose pond. Her koi are already back in their home.
-
Should be about the top of the tide at Pak Kret. About an hour before we peak at the house. EDIT about an hour later Top of the tide at the house.
-
New 3-phase installation with 3-phase heater
Crossy replied to campyk's topic in The Electrical Forum
That would depend upon how long you want to live for in the event of a L-E fault. In reality, with a properly implemented TNC-S (MEN) system you could probably get away without. But ... -
I shall have to verify but I'm 99% sure that your BKK card will work just fine in Phuket and vice-versa.
-
He drives a Monster Truck too
-
Just a heads-up (I used an agent to do the actual submission) but it's just taken 14 weeks from the date the UK charged my card to my receiving an email saying my new passport is ready for collection. Make sure you are applying in plenty of time, I thought I had but it's still cutting it fine to do my extension renewal.
-
The first of the bigger (tomorrow and over the weekend is the highest I think) tides has arrived at Pak Kret. Actually looks like there should be no problem, at least for us. Others may be less fortunate ????
-
Has anyone received a new UK passport recently?
Crossy replied to onebaht's topic in Visas and migration to other countries
Yeah, understand that (at least that's what we are told anyway...). But by the time another renewal comes around the system will have been further "improved" and probably require a physical presence in the office and a stool sample. Over the >40 odd years I've had and renewed my PP (mostly because full) each renewal has been further "streamlined"** which invariably slows it down. Last time I think it was done out of Hong Kong and was reasonably quick (4 weeks ish IIRC). ** The "streamlined" process is invariably less costly, unlike the passport itself. -
What items would you bring in your luggage from USA?
Crossy replied to Elkski's topic in Thailand Travel Forum
A max of 1 litre of alcoholic beverages is permitted. There's no mechanism in place to pay duty on any excess (same with the tobacco limits of 200 cigarettes / 250g of pipe/rolling tobacco). -
Has anyone received a new UK passport recently?
Crossy replied to onebaht's topic in Visas and migration to other countries
Finally got my email today ???? "Only" 14 weeks since they took the $$$ from my card ???? Totally appalling "service" and the inability to easily track overseas applications is just crazy. I wonder how long it will take in 10 years' time when this one expires. Long, long ago (ok 2001, so this century) I had my PP stolen in Rome (the Italian one). I got a new PP the same day from the embassy! (I was at the gate, police report in hand, when they opened, otherwise it would have been next day) -
It can be. But. Without knowing what and where it's impossible to say. Something like our home = brilliant value. Something like the place Madam built for family = major rip-off.
-
What are you actually asking from us? There's a load of building experience from all over the country here, but if we don't know what you want to know we cannot really help.
-
Chao Phraya riverside communities warned of high tides until Nov 9th
Crossy replied to snoop1130's topic in Bangkok News
Meanwhile our puyai-baan is talking about removing the sandbag barrier on the road by the end of October ...- 1 reply
-
- 1
-
Do you have drawings / sketches of what you want to do? Again, location is important, building costs vary vastly across the country. How big is the land you want to fill, depth of fill needed? Again, costs vary vastly. I'm going to assume that "American style" does not include it being of timber (termite food) construction.
-
Our place cost 4.5M without the A/C etc. Northern BKK (land not included). Lots of teak = $$$. Just the teak barge-boards cost 250k ???? https://aseannow.com/topic/481794-housebuilding-thread/ Madam built this for the family in steel and Shera board, cost <1M, Pha-Chi (Ayutthaya), again land not included.
-
What size are you thinking of, style, level of finish needed, (important) location??
-
New 3-phase installation with 3-phase heater
Crossy replied to campyk's topic in The Electrical Forum
That heater does look a bit odd, but it's certainly not earth return on one element. Just how the 3 incoming phases map to what appears to be 4 elements in a star arrangement is unknown. It will certainly need a 3-phase RCBO which could be 3 or 4 wire (if it has a neutral just connect to the neutral bar so the Test button works). I'm still not convinced that a 3-phase heater is actually needed, particularly on such a massive supply. EDIT A quick scan of the available plug-on accessories doesn't reveal a 3-phase RCBO, which surprises me somewhat. -
New 3-phase installation with 3-phase heater
Crossy replied to campyk's topic in The Electrical Forum
I would certainly avoid any boards the need "special" devices. The Schneider/Square-D boards, although not DIN mount, have the advantage of being readily available and being able to accept both 3-phase and single-phase MCBs and RCBOs in any position. There are other manufacturers of plug-in MCB/RCBOs that fit too. I wouldn't go with Schneider surge protection (it's crazy $$$), definitely add a small DIN box and use the lower cost option. It may also be worth considering using sub-boards rather than packing everything into one central board. Of course, that depends upon the layout of the property, but any place that needs a >60kW supply is going to be pretty substantial. It may also be worth looking at your hot water plans, is one big heater or several smaller (single-phase) heaters more practical? Also, if you really need a massive heater (the biggest single-phase unit I've seen is 8kW) then do look at gas heaters, they are low cost and really blast the heat without killing your power supply. -
-
New 3-phase installation with 3-phase heater
Crossy replied to campyk's topic in The Electrical Forum
1. The current ratings of your board are per-phase. Do note that the actual rating of the main incoming MCCB will be determined by the size of the supply being provided by MEA/PEA. 2. I would wire the heater in 4mm2 on a 32A 3-phase breaker. A 20A is just a bit close when the heater is running at full power. 3. There isn't any "leftover current", what you will end up with is one element running at full power with two others running in series at about 25% full power each. 4. I would always buy branded MCCB/MCB for the main supply, similarly for your RCD/RCBOs. SPDs tend to be expensive from the brand names and you don't necessarily get value for money. 5. Main breaker will be 3-pole, you don't usually switch the neutral on a 3-phase install. 6. It's called TNC-S (MEN) as the neutral is grounded on every 3rd pole as well as by the rod on your property. It's a standard install here. -
How about a DIY three-input Automatic Transfer Switch?
Crossy replied to Crossy's topic in Alternative/Renewable Energy Forum
This is the relevant illustration from AS3000 (2018), note that the mains neutral is NOT switched by the transfer device (but the aux supply neutral IS switched). Since Thailand has a very similar TNC-S (MEN) system to Oz I may have to modify the design. Thanks for the heads-up @bluejets. I shall have to locate the relevant UK document. -
Don't call me Shirley!!