There are a Plethora of evidence if you care to look on line from the government contract to the specs for the product, product stipulated in the contract from the government is the wrong product for this application the product is called pipeline 5000 which is a spray on polyurea-polyurethane hybrid coating, you cannot cut it with a knife News flash: it’s impossible. the product is light sensitive, it de-laminates ,these coatings are very climate-sensitive. If done in direct sunlight, it could cause the product to cure too quickly and not adhere to the concrete. Also, if the concrete was not properly prepared at the time and not Shot blasted down properly, the coating would not be able to soak in. Additionally, moisture could have been in the ground at the time of application. The coating used does not like Oxidizer, hydrogen peroxide is an Oxidizer so pouring into the pool does not help The timeline was unrealistic normally several layers need to be applied and can take weeks There was no due diligence carried out on selecting the product by the government,the product is NOT recommended for open air pools it was designed to coat the internals of enclosed pipes it does not take a genius to see the mistakes the government and the contractor made its a great advertisement to show the lack of due diligence and quality of workmanship America carry s out on its contracts
Create an account or sign in to comment