Pink7 Posted September 23, 2023 Author Share Posted September 23, 2023 9 minutes ago, MJCM said: Found the link, in your other thread. Updated my post. Still Wish it was that cheap 555555555555 Yea that would be a dream 555 Pink Link to comment Share on other sites More sharing options...
Ben Zioner Posted September 23, 2023 Share Posted September 23, 2023 7 minutes ago, Crossy said: Battery side. Under-construction photo, the wiring has been tidied somewhat and the larger battery box is now enclosed. Ok, I see that your batteries will be in a well ventilated are, my shed is closed concrete block, should I foresee a forced extraction fan? To be clear all I got now, is the shed wired so that I can insert a generator. enough money (unless they income tax) and a ridiculous offer from PEA for 10KW On Grid plus a Diesel generator. I live in Buriram and have been unable to find and english speaking supplier for On Grid Hybrid. Maybe I should look for someone who can speak Hebrew, German of French. Link to comment Share on other sites More sharing options...
Pink7 Posted September 23, 2023 Author Share Posted September 23, 2023 3 minutes ago, MJCM said: I found one, but I am surprised they are so cheap 700THB(ish) https://www.lazada.co.th/products/yqk-70-hydraulic-clamp-4-70-sqmm-hydraulic-crimping-pliers-i1826820163-s5495794451.html I have it. I would not buy hydraulic again. I have open it many times becouse it stoped to work then until now been lucky to be able to use it. Buy the type Crossy just post. Much longer life. Pink 1 Link to comment Share on other sites More sharing options...
Crossy Posted September 23, 2023 Share Posted September 23, 2023 8 minutes ago, Ben Zioner said: Ok, I see that your batteries will be in a well ventilated are, my shed is closed concrete block, should I foresee a forced extraction fan? Lithium batteries don't out-gas like lead-acid do so I wouldn't bother with forced ventilation other than maybe for keeping things (you) cool. EDIT If you have your genset in there you may want ventilation that runs with the generator. Link to comment Share on other sites More sharing options...
MJCM Posted September 23, 2023 Share Posted September 23, 2023 1 hour ago, Pink7 said: I have it. I would not buy hydraulic again. I have open it many times becouse it stoped to work then until now been lucky to be able to use it. Buy the type Crossy just post. Much longer life. Pink Thx. Ordered that one. Link to comment Share on other sites More sharing options...
MJCM Posted September 23, 2023 Share Posted September 23, 2023 2 hours ago, Ben Zioner said: I live in Buriram and have been unable to find and english speaking supplier for On Grid Hybrid. Maybe I should look for someone who can speak Hebrew, German of French. Have fun doing that. Just go online and buy direct from the manufacturer. I am doing the same with my new Inverters (Hybrid one and On-Grid (grid-tie) one). It is also a learning experience. If you buy direct from the Manufacturer ask if they have a Direct Line to Thailand for Shipping, in that case it could cut costs for customs etc etc Ps: I am in Buriram as well. Link to comment Share on other sites More sharing options...
Ben Zioner Posted September 23, 2023 Share Posted September 23, 2023 2 hours ago, Crossy said: Lithium batteries don't out-gas like lead-acid do so I wouldn't bother with forced ventilation other than maybe for keeping things (you) cool. EDIT If you have your genset in there you may want ventilation that runs with the generator. I won't consider any offer for On Grid from PEA unless they buy the KWh at 70% of their selling price, so no genset. I will keep searching for someone who make and On-Grid Hybrid installation. Link to comment Share on other sites More sharing options...
TimeMachine Posted September 23, 2023 Share Posted September 23, 2023 1 minute ago, Ben Zioner said: I won't consider any offer for On Grid from PEA unless they buy the KWh at 70% of their selling price, so no genset. I will keep searching for someone who make and On-Grid Hybrid installation. If you don't tell them you have solar you can get 1 to 1 so I am told if you have the old disc meter 1 1 Link to comment Share on other sites More sharing options...
MJCM Posted September 23, 2023 Share Posted September 23, 2023 2 minutes ago, Ben Zioner said: I won't consider any offer for On Grid from PEA unless they buy the KWh at 70% of their selling price, so no genset. I will keep searching for someone who make and On-Grid Hybrid installation. Talk to @KhunLA maybe his installer has what you want, but AFAIK he is from HuaHin but does projects all over Thailand Link to comment Share on other sites More sharing options...
Ben Zioner Posted September 23, 2023 Share Posted September 23, 2023 11 minutes ago, MJCM said: Have fun doing that. Just go online and buy direct from the manufacturer. I am doing the same with my new Inverters (Hybrid one and On-Grid (grid-tie) one). It is also a learning experience. If you buy direct from the Manufacturer ask if they have a Direct Line to Thailand for Shipping, in that case it could cut costs for customs etc etc Ps: I am in Buriram as well. Too old and lazy for any DIY, don't want to work on roof. Link to comment Share on other sites More sharing options...
MJCM Posted September 23, 2023 Share Posted September 23, 2023 (edited) 4 minutes ago, TimeMachine said: If you don't tell them you have solar you can get 1 to 1 so I am told if you have the old disc meter ssshhtttttttt But don't get caught spinning your meter backwards (or going into negative meter readings) or you will be stuck with a digital meter, which (AFAIK) will charge you for Export. Edited September 23, 2023 by MJCM Link to comment Share on other sites More sharing options...
MJCM Posted September 23, 2023 Share Posted September 23, 2023 Just now, Ben Zioner said: Too old and lazy for any DIY, don't want to work on roof. same here, and my install is on the wall (and the next set of panels will on a flat part of our land just outside the wall, which you can see on the right. 1 Link to comment Share on other sites More sharing options...
Ben Zioner Posted September 23, 2023 Share Posted September 23, 2023 4 minutes ago, TimeMachine said: If you don't tell them you have solar you can get 1 to 1 so I am told if you have the old disc meter I want to make a proper business decision, so I won't take into account a loophole that won't last, or isn't available where I live. Link to comment Share on other sites More sharing options...
MJCM Posted September 23, 2023 Share Posted September 23, 2023 (edited) 14 minutes ago, Ben Zioner said: I want to make a proper business decision, so I won't take into account a loophole that won't last, or isn't available where I live. but your 70% isn't going to happen also, because Thailand is one of those countries where it (seems) is very hard to be able to feed-in. One member on here is already waiting for well over a year to be able to feed-in and he has done everything by the book and used an approved installer. And PEA has even come over to his property several times already (and he already paid the money for the approval etc etc) Just look up threads from the member @Thaifish (Ps: Did I mention he is from Buriram as well??) Edit: Found a topic from last Feb Edited September 23, 2023 by MJCM Used some wrong figures. Corrected Link to comment Share on other sites More sharing options...
TimeMachine Posted September 23, 2023 Share Posted September 23, 2023 9 minutes ago, MJCM said: but your 1 to 1 isn't going to happen also, because Thailand is one of those countries where it (seems) is very hard to be able to feed-in. One member on here is already waiting for well over a year to be able to feed-in and he has done everything by the book and used an approved installer. And PEA has even come over to his property several times already (and he already paid the money for the approval etc etc) Just look up threads from the member @Thaifish (Ps: Did I mention he is from Buriram as well??) Edit: Found a topic from last Feb Interesting. Don't know why everyone is worried about climate change. If it's real . We are clearly doomed. Most governments Couldn't organise a root in a brothel let alone deal with energy and climate. 1 Link to comment Share on other sites More sharing options...
MJCM Posted September 23, 2023 Share Posted September 23, 2023 12 minutes ago, TimeMachine said: Interesting. Don't know why everyone is worried about climate change. If it's real . We are clearly doomed. Most governments Couldn't organise a root in a brothel let alone deal with energy and climate. 555555555555 In that quoted post there is a mistake in my post which I later (after you posted) changed. The error is (in the first line) 1-1 which you wrote and I quoted it to BenZ changed it to 70% My bad. In my home country, people sometimes have to pay to feed-in (YES you read that correctly), because there they use fluctuating energy prices and sometimes it's even negative. I am in the process (longer term planning though) is to get enough Batteries in (around 30-40kW) to be a bit autonomous, but that SAID we well NOT discard our PEA line. For example we wired our install that certain points (like the 8kW water heater and a plug for welders) are directly connected to the PEA and thus bypass solar completely. So we will still receive a bill from the PEA for when we use those. Also when we have our Batteries in place we will stop exporting (read: Spinning the Meter backwards). Hopefully soon, the first part, a 10kW Battery pack will be in place, and we will expand gradually. I could go the full nine yards by getting the full 30kW Pack, but the controlling/deciding/hampering factor is SWMBO (Someone said to me. slowly slowly catch a monkey and that is what I am doing ) 1 Link to comment Share on other sites More sharing options...
Crossy Posted September 23, 2023 Share Posted September 23, 2023 1 Link to comment Share on other sites More sharing options...
Popular Post Thaifish Posted September 25, 2023 Popular Post Share Posted September 25, 2023 (edited) On 9/23/2023 at 3:56 PM, MJCM said: Just look up threads from the member @Thaifish (Ps: Did I mention he is from Buriram as well??) Edit: Found a topic from last Feb @MJCM and OP. Regarding meters there's still no show with my digital meter. 3 years waiting now. It just so happens though I visited PEA Nang Rong Burriram about 6 weeks ago to hassle them for a digital meter again! again! again! and they had a tent set up displaying the new digital meters which where to be installed everywhere. Since then I have seen them being installed en-mass in surrounding villages. Just yesterday I noticed our village starting to get them. I'm guessing within the next couple of weeks or sooner we will finally get one. What I am hearing now is even though we will get one we still wont be able to export as there is no 3 phase only single phase passing our Bahn. Absolutely crazy the excuses they come up with. TiT... Since my 10kw system was installed 2021 I have exported 21.59Mwh of single phase power and Im wasting power with A/C running all day because I can. If I did get the 2.2bht supposed rebate I would have made 21590Kwh x 2.2bht=47498bht. Again I'm wasting power for no need. Edited September 25, 2023 by Thaifish 3 Link to comment Share on other sites More sharing options...
Pink7 Posted September 25, 2023 Author Share Posted September 25, 2023 (edited) On 9/23/2023 at 4:32 PM, MJCM said: In my home country, people sometimes have to pay to feed-in (YES you read that correctly), because there they use fluctuating energy prices and sometimes it's even negative. Same here, its a Europe phenomena. Imagine the days they get payed to use energy. The more you use the more you got payed. Its not very environment friendly. Pink Edited September 25, 2023 by Pink7 Link to comment Share on other sites More sharing options...
Popular Post Pink7 Posted September 25, 2023 Author Popular Post Share Posted September 25, 2023 (edited) Just lost grid power again for an hour or so. I feel the pain thinking I should have my solar up and running already and should enjoy my own power.. Well it should not be too many days now before all up and running ( hopefully) Today im on BMS.. making wires ready... Pink Edited September 25, 2023 by Pink7 2 1 Link to comment Share on other sites More sharing options...
Popular Post Crossy Posted September 25, 2023 Popular Post Share Posted September 25, 2023 2 hours ago, Pink7 said: Today im on BMS.. making wires ready... Check, check and check again before actually connecting the BMS. You don't want to let out the Magic-Smoke! The result of not RTFM! No, not mine!! 1 2 Link to comment Share on other sites More sharing options...
MJCM Posted September 25, 2023 Share Posted September 25, 2023 And that ^^^^^^^^^^^^^^^^ is one of the reasons why I will NOT build my OWN Battery Pack 1 Link to comment Share on other sites More sharing options...
Pink7 Posted September 25, 2023 Author Share Posted September 25, 2023 2 hours ago, Crossy said: Check, check and check again before actually connecting the BMS. You don't want to let out the Magic-Smoke! The result of not RTFM! No, not mine!! Yes all will be tested first. Pink 1 Link to comment Share on other sites More sharing options...
Popular Post Pink7 Posted September 28, 2023 Author Popular Post Share Posted September 28, 2023 Needed some days waiting for some small parts.. but now battery 1 is up with JK BMS. Still need to do the settings, this is default settings. Pink 2 1 Link to comment Share on other sites More sharing options...
Crossy Posted September 28, 2023 Share Posted September 28, 2023 Looks pretty good. Do you have a charger or power supply that goes to 60V or so? If possible, give it a charge to 58V (3.65V per cell) overall and leave for a little while (days) for the balancer to do its job. Link to comment Share on other sites More sharing options...
Pink7 Posted September 29, 2023 Author Share Posted September 29, 2023 Both bms are up and show normal voltage but on inverter battery poles i get 155mv. Pink Link to comment Share on other sites More sharing options...
Crossy Posted September 29, 2023 Share Posted September 29, 2023 Time to check your wiring. Got volts at the BMS output terminals? Also, did you turn on the BMS? EDIT The "control" button, bottom right of the screen, might do something. Link to comment Share on other sites More sharing options...
Pink7 Posted September 29, 2023 Author Share Posted September 29, 2023 JK BMS default does not charge or take load so it had to be setup. the i got the expected voltage. pink 1 Link to comment Share on other sites More sharing options...
Pink7 Posted November 1, 2023 Author Share Posted November 1, 2023 Last day I got quite allot of difference Amp level of my to batteries and i wondering if my parallel cables between the 2 breakers not doing the job as i should. Today i tested to close down the battery with most Amp to get more Amp on the one with less, but I see much less Amp on the parallel cables than I wold expect. I will try investigate this and try collect some more details on this. My setup use cables between the breakers instead of busbar. Pink Link to comment Share on other sites More sharing options...
Crossy Posted November 1, 2023 Share Posted November 1, 2023 Are your cables approximately equal length?? You can expect some variation as the packs charge / discharge even if everything is "identical". Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now