Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Suvarnabhumi plan must be grounded for checks [Editorial]

Featured Replies

Suvarnabhumi plan must be grounded for checks

By The Nation

 

images.jpg

 

Council of Engineers has raised serious doubts over location for planned second terminal – the PM must heed them 

 

Thailand’s Council of Engineers (CoE) on Wednesday submitted a letter to Prime Minister Prayut Chan-o-cha requesting a review of the Airports of Thailand (AOT)’s Bt42-billion project to build a second passenger terminal at Bangkok’s Suvarnabhumi Airport. The CoE claims the location for the expansion is inappropriate and could seriously impact the country’s main international gateway.

 

Krai Tangsa-nga, CoE vice president, said the plan for a second terminal to be situated east of the existing passenger building runs  counter to Suvarnabhumi Airport’s 1990 master plan, which stipulates that the terminal be built to the south, near Bang Na-Trat Highway.

 

The prime minister must now urgently review the project to ensure that a potentially disastrous mistake for Thailand’s transport infrastructure is avoided. AOT is in the process of inviting bids for the design and construction of the second terminal, which it says will allow the airport to handle another 30 million passengers per year, up from the current 45 million.

 

As a professional body, the CoE is required by its charter to provide engineering and related recommendations to the government. It’s duty in this case is clear: it must urge the prime minister to ensure that AOT follows the master plan by expanding the airport for maximum efficiency in serving both domestic and international passengers.

 

The CoE noted that any changes to the master plan require a detailed feasibility study and public hearing to assess the impacts which may arise. In addition, the AOT’s blueprint for the second passenger terminal project is not covered by the master plan, so the project may lead to serious airside, landside and other structural problems, including with the availability of public utilities and other support facilities.

 

The airport relies on more than 20 sub-systems to ensure the efficiency and effectiveness of its operations and passenger services. These could be adversely affected by a change in the master plan that has not been subject to a detailed feasibility study to explore unforeseen consequences.

 

The danger is that the quality of services provided to Thai and international passengers will be undermined, affecting the country’s status and reputation as a regional aviation hub. This would damage the tourism industry, a vital economic driver thanks to nearly 40 million foreign tourist arrivals per year which generate more than 10 per cent of the country’s GDP.

 

Other experts have already voiced opposition to the airport expansion plan, reasoning that AOT should first expand the eastern and western wings of the existing passenger terminal to boost Suvarnabhumi’s passenger capacity.

 

The agency decided, however, to build the new passenger terminal east of the existing building, arguing that the master plan could be altered and that the International Civil Aviation Organisation had endorsed the change.

 

Given the serious doubts raised by experts over a project that could have huge impacts on the Thai economy and its tourist industry, the prime minister is duty-bound to order a review. 

 

Source: http://www.nationmultimedia.com/detail/opinion/30356296

 
thenation_logo.jpg
-- © Copyright The Nation 2018-10-12

Interesting. Do they know what they are doing or just upset that they got by passed ?

5 hours ago, webfact said:

arguing that the master plan could be altered and that the International Civil Aviation Organisation had endorsed the change.

Or so it claims?

How often do we hear from Thai government quasi-agencies about what other organizations that it has no control over really say?

5 hours ago, webfact said:

The prime minister must now urgently

.... apply Article 44 to bypass all those messy engineering issues just as Prayut did to startup the EEC development.

It's all a bit late now.....the building is pretty much out of the ground now, talking about location now is dopey....!

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.