What's all this On-Grid, Off-Grid, Hybrid stuff all about. Solar systems demystified.
-
Recently Browsing 0 members
- No registered users viewing this page.
-
Topics
-
-
Popular Contributors
-
-
Latest posts...
-
52
BKK Bank 4 months banked method??
The agents will just continue to use their existing bank contacts or find new ones, and pay for the paperwork needed. It won't change anything. -
15
USA Lancet Study: Trump’s Foreign Aid Cuts Could Result in Millions of Preventable Deaths
Misplaced outrage. Foreign aids total $70 billons paled against the $114 billions in tax cut for the richest 1%. Totally unnecessary cut for the 1% filty rich while the neglecting the millions in poverty dying and suffering. -
159
Report Thai Woman's Bold Demand for 1 Million Baht Sparks Online Debate
I will give her 100 trillion. -
147
-
43
Report Bangkok Building Collapse Blamed on Design Flaws, Says PM
You are correct concerning the designs. Here, in all my experience the designs are required to checked by an independent registered engineer. Reason for posting is to add that the construction drawings have to checked and approved by the supervising engineer for compliance with the design. So, the supervising engineer has to be potentially accountable, as well as the design approver. The supervising engineer also has a responsibility for checking / verifying quality of materials. -
11
Politics Suriya Jungrungreangkit Appointed Acting PM Following Constitutional Court Ruling
With so many deputy PMs how do they decide who gets it? How about creating a new ministry that would suit her better. Ministry of TikTok.
-
-
Popular in The Pub
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now