Jump to content

Sealing of damaged Rayong oil pipeline expected to be completed on Friday


webfact

Recommended Posts

TSNBg3wSBdng7ijMhwZm2FZYFpMWIczA3C7gVOfvAc0.jpg

 

After days of delays in efforts to seal one of the two ruptures in a flexible submarine oil pipeline, Star Petroleum Refining Plc (SPRC) is set to install a collar clamp over the defect today (Monday), with the sealing operation expected to be concluded on Friday.

 

The sealing efforts entered their 11th day today, and the 49th day of extracting residual oil from the pipe.

 

Attempts to seal the upper rupture were originally scheduled to be completed in eight days. The company explained, however, that the maintenance work was delayed by ebb tides, which have forced workers to proceed with extra caution.

 

Keep up to date with all things Thailand - Join our daily ASEAN NOW Thailand Newsletter - Click to subscribe

 

Full story: https://www.thaipbsworld.com/sealing-of-damaged-rayong-oil-pipeline-expected-to-be-completed-on-friday/

 

Logo-top-.png
-- © Copyright Thai PBS 2022-03-14
 

- Aetna offers a range of visa-compliant plans that meet the minimum requirement of medical treatment, including COVID-19, up to THB 3m. For more information on all expat health insurance plans click here.

 

Link to comment
Share on other sites

2 hours ago, webfact said:

After days of delays in efforts to seal one of the two ruptures in a flexible submarine oil pipeline, Star Petroleum Refining Plc (SPRC) is set to install a collar clamp over the defect today (Monday), with the sealing operation expected to be concluded on Friday.

No rush then?

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...