Popular Post snoop1130 Posted June 16, 2023 Popular Post Share Posted June 16, 2023 Pattaya mayor Poramase Ngampiches ordered the contractor to speed up the construction of a drainage system around Second Road and Soi 15 Buakhao in order to return the space to the residents. Pattaya City started the construction of a drainage system in Soi Kasemsuwan 15 to connect to Pattaya Beach Road. The project included drilling and road surfacing, stretching from the Wat Chaimongkol intersection and extending through Soi 10 on Pattaya Second Road. The project is currently delayed due to complications related to high-voltage underground power lines. By Tanakorn Panyadee Caption: PHOTO: PRPATTAYA Full Story: https://thepattayanews.com/2023/06/16/pattaya-mayor-orders-to-speed-up-roadwork-around-second-road-and-soi-15-buakhao/ -- © Copyright The Pattaya News 2023-06-16 - Cigna offers a range of visa-compliant plans that meet the minimum requirement of medical treatment, including COVID-19, up to THB 3m. For more information on all expat health insurance plans click here. The most versatile and flexible rental investment and holiday home solution in Thailand - click for more information. 3 Link to comment Share on other sites More sharing options...
hotchilli Posted June 16, 2023 Share Posted June 16, 2023 Speed up construction? No chance. 1 1 Link to comment Share on other sites More sharing options...
stoner Posted June 16, 2023 Share Posted June 16, 2023 correct me if i'm wrong but a few mere weeks ago this man said it would be done at the given deadline. 1 Link to comment Share on other sites More sharing options...
malibukid Posted June 16, 2023 Share Posted June 16, 2023 same thing here in CM. complete joke. Link to comment Share on other sites More sharing options...
jacko45k Posted June 16, 2023 Share Posted June 16, 2023 I thought soi 15 had been suspended? IIRC they still have to dig down and bury drains at the Buakhao end......that should be messy! Link to comment Share on other sites More sharing options...
Popular Post mrbojangles Posted June 17, 2023 Popular Post Share Posted June 17, 2023 What about Threpprasit? That is just getting worse with every inch of work they do. The new concrete curbs in the middle of the road forcing eberyone further up the road to do a U-Turn is absolute bonkers 3 1 1 Link to comment Share on other sites More sharing options...
Peabody Posted June 17, 2023 Share Posted June 17, 2023 Or what? Link to comment Share on other sites More sharing options...
newnative Posted June 17, 2023 Share Posted June 17, 2023 3 hours ago, mrbojangles said: What about Threpprasit? That is just getting worse with every inch of work they do. The new concrete curbs in the middle of the road forcing eberyone further up the road to do a U-Turn is absolute bonkers Yes, total mess. The other day we were driving on it and noticed one of the workers using his foot to smooth the soil before doing lord knows what. Talk about primitive tools. As always, very few workers on site. If they were going to do turning lanes they should have eliminated parking in the turning lane sections to allow space for an actual turning lane and 2 thru lanes. Our least favorite road and getting worse, not better. And, the less said about the sidewalks, the better. 2 Link to comment Share on other sites More sharing options...
chalawaan Posted June 17, 2023 Share Posted June 17, 2023 Yeah they gotta rip it up again in time for the next year's budget handouts from Bangkok. 1 Link to comment Share on other sites More sharing options...
Deli Posted June 17, 2023 Share Posted June 17, 2023 Mayor is part of the local Mob and paid by them. Nothing happens. 1 Link to comment Share on other sites More sharing options...
jacko45k Posted June 17, 2023 Share Posted June 17, 2023 And presumably all he got was a puzzled look and asked 'why would we do that?' 1 Link to comment Share on other sites More sharing options...
Andycoops Posted June 18, 2023 Share Posted June 18, 2023 Bunch of jokers, how many previous orders to complete the work have been issued, with no effect whatsoever. 1 Link to comment Share on other sites More sharing options...
Kevbo Posted June 18, 2023 Share Posted June 18, 2023 On 6/17/2023 at 12:24 AM, jacko45k said: I thought soi 15 had been suspended? IIRC they still have to dig down and bury drains at the Buakhao end......that should be messy! Different site ......recently a large digger has arrived so maybe resume work Link to comment Share on other sites More sharing options...
jacko45k Posted June 18, 2023 Share Posted June 18, 2023 5 minutes ago, Kevbo said: Different site ......recently a large digger has arrived so maybe resume work I was told 2nd Rd end has work going on...Buakhao end I didn't see anything this morning. My point only being the past drainage work was suspended prior to completion, after the cherry picker hit power lines and caused a fire.....Just wonder if that too needs completion. Link to comment Share on other sites More sharing options...
morrobay Posted June 19, 2023 Share Posted June 19, 2023 And what about this endless , 2nd Rd. ####show Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now