Realistically speaking, do you think Trump will last till November?
-
Recently Browsing 0 members
- No registered users viewing this page.
-
Topics
-
-
Popular Contributors
-
-
Latest posts...
-
9
Is paying the bar to take a girl out of the bar justified? Or just a scam?
Watch the bars you frequently visits 1. Every month if they have popular attractive girls. Or restaurants or any other shop in tourist districts -
5
Will The US Enter Into A War With Iran
Nah, why would Trump get into a war with that lot ? -
9
Is paying the bar to take a girl out of the bar justified? Or just a scam?
From Buriram, 26, has money problems, has an 8 year-old daughter and speaks decent English - I think I know her. Does she have a one syllable, three letter name?- 1
-
-
345
Will there ever be a safe vaccine?
just more unverified interpretation by biased publication.... find your own figures from the sources. Why do you continually rely on opinion pieces rather than reporting by the organizations in charge? -
5
Will The US Enter Into A War With Iran
Strange that such an important, world changing topic with worldwide implications doesn't pique the interests of posters here, while when a trivial subject comes up Drow many replies, I should know, I have on this site for long, long time. -
0
Spanish Power Outage - The Official Report
https://euroweeklynews.com/2025/06/18/spains-blackout-cause-finally-revealed/ The report itself https://d1n1o4zeyfu21r.cloudfront.net/WEB_Incident_ 28A_SpanishPeninsularElectricalSystem_18june25.pdf From here https://www.ree.es/en/operation Interestingly: - "The incident was NOT caused by a lack of system inertia. Rather, it was triggered by a voltage issue and the cascading disconnection of renewable generation plants, as previously indicated. Higher inertia would have only resulted in a slightly slower frequency decline. However, due to the massive generation loss caused by voltage instability, the system would still have been unrecoverable." The TL;DR sequence of events is summarized in the report as follows: (Note: The generation that must comply with P.O. 7.4 regulates, in a mandatory way, voltage dynamically and independently of the active power they are generating, thus it ensures stable voltages in the network. and RCW = Renewable, Cogeneration, and Waste) 1. Forced oscillation at 0.6 Hz, possibly originating in a photovoltaic power plant in the province of Badajoz,triggers system-altering protocolized actions. Shunt reactors are operated, lines are coupled due to oscillations, and schedules are modified. (N-1) 2. Natural oscillation at 0.2 Hz triggers further system-altering protocolized actions. Shunt reactors are operated, lines are coupled due to oscillations, and schedules are adjusted. (N-2). 3. Generation under P.O. 7.4 does not absorb the required reactive power. (N-3). 4. Variations in RCW generation during active power regulation affect voltage control and many of them don't fulfil their obligations. (N-4). 5. The conventional generation requested after the oscillations was not connected. 6. Generation loss in distribution: P < 1 MW and self-consumption of 435 MW before 12:32:57 (N-5). 7. Inappropriate tripping of a generation transformer in Granada (N-6). 8. Inappropriate tripping of solar thermal generation (Badajoz) and tripping of photovoltaic (Badajoz) withoutpoint-of-interconnection data from transmission network (N-7). 9. Inappropriate tripping of a photovoltaic power plant connected also in the province of Badajoz but in a different transmission substation (N-8). 10. Tripping of three wind farms (Segovia) without point-of-interconnection data from transmission network. 11. Tripping of one wind farm and a PV plant located at the province of Huelva, without point-of-interconnection data from transmission network. 12. Inappropriate tripping of photovoltaic power plant in Seville (N-9). 13. Inappropriate tripping a PV generation located in the province of Cáceres (N-10). 14. Tripping of PV generation connected to a 220 kV substation located in the province of Badajoz, withoutpoint-of-interconnection data from transmission network. 15. Tripping of one CCGT unit located at Valencia (N-11). 16. Load shedding of pumping units and loads due to underfrequency results in increased system voltage. 17. The HVDC link operating in constant power mode continues exporting 1,000 MW to France. 18. Tripping of Nuclear Power Plant. (N-12)
-
-
Popular in The Pub
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now