7 Types of Used Cars to Avoid in Thailand
-
Recently Browsing 0 members
- No registered users viewing this page.
-
Topics
-
Popular Contributors
-
Latest posts...
-
141
Trump’s Bold Proposal to End Gaza’s Cycle of Suffering
BS. The Muslim states don't want them as they created a cancerous autonomous bubble in South Lebanon, undermining the Lebanese government. You must be off your head if you think other Arab states want that to happen to them. -
0
CNX Airport early 2025
1 . CNX is a single runway airport. RWY 36-18 is 11,000 but the actual usable portion is less. 2. The terminal and gate areas are very crowded. I took an international flgiht in Jan and Feb 2025. 3. The combination of domestic flights and now growing number of international flights has me concerned. 4. Have been a commercially rated pilot for 20 years but I have never worked for an airline. But I do have a good understanding of the limits of busy single runway airports. 5. Here are some of the international flight that land and depart from CNX: Asiana, to Incheon, Air China to PEK, Cebu Pacfic to Manila, China Airlines to Taipei, China Eastern and Southern to the ROC, Easter Jet to S. Korea, EVA to Taipei, HK Express to Hong Kong, Jeju Air (still flying for now) jin Air-Incheon, Korean to Incheon, Scoot to SIN, Starlux to Taipei Viet Jet to Oasaka and lastly Air Asia to KL(2x a day). This list is not compete and even Eithiad has plans to start service in late 2025. These are a lot of international flight for CNX and some of these carriers do not fly everyday. Here are my main concerns: 1. One runway incident will knock the airport out of commission. The nearest alternative airport that can handle the traffic is probably BKK or DMK. That is a long away to get back to Chiang Mai via car, bus or train. 2. All airport runways need to be inspected and maintained on a regular basis. This means the runway has to be closed. Inspection and maintanence should be conducted during the day. I have never heard of this airport being closed for inspection and maintanence. I believe CNX airport is at or beyond capacity for safe operations. The time to build a new airport is anywhere from 3 to 5 years from start to finish. Everytime an airplane lands small amounts of rubber from the tires are left on the surface. This rubber has to be removed to ensure safe landings. This can take hours to complete. If there is availabe land a faster solution would be build a second shorter runway that is parallel to RWY 36 to 18. -
141
Trump’s Bold Proposal to End Gaza’s Cycle of Suffering
I suggest you send that to Trump, he seems blissfully unaware of any problems in evicting Palestinians from their homeland to Egypt and other Muslim states. Incidentally, here’s a challenge for you: Why do I need to Google wadi Tal? Explain the relationship he has with anything I have said on the consensus for a two state solution. -
163
Trump’s mad, mad, mad, mad world—now with extra madness
There is a Hamas and Israel war that Hamas started, not a PALESTINIAN WAR -
1,372
-
18
Is Sukhumvit Soi 24 the best mix of everything in 2025?
I think I prefer to live with more westerners to be honest.
-
-
Popular in The Pub
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now