Pathiu flooding?
-
Recently Browsing 0 members
- No registered users viewing this page.
-
Topics
-
Popular Contributors
-
Latest posts...
-
34
Third Reich is upon you!
The Air Force leads, but the Army follows close behind: "The intent is to preserve our history, and we are working to re-publish content as soon as possible." -
156
Chinese Men Caught Removing Documents from Collapsed Building in Bangkok
FWIW, in reading other materials already posted elsewhere here, it sounds like the design used by the Chinese company developer for the State Audit building was an "unconventional" one, to say the least. It sounds like the builder was trying to show some kind of proof of concept construction method that obviously failed spectacularly. Via Google Translate: Thailand's new audit office building main structure successfully capped China Railway Ten Bureau Group 2024-04-03 "The main building of the new audit office building is 137 meters high, and the structure is in the form of "core cylinder + beamless floor". The core cylinder adopts the slide mold construction technology, the beamless floor plate adopts the lifting mold installation process, and the outer frame adopts the climbing construction process. In order to ensure the quality of super-high-level concrete, a project technical research group was established at the beginning of the start to study key technologies. Slip mode construction technology The slider construction technology uses the slider device to slide the 1.2-meter-high tool-type template along the concrete surface, controlling the thickness of each layer of concrete not exceeding 25 cm, and achieving an effective slide of the template. In the process of sliding, the measurement correction is done, and the horizontal deviation of the slide mode working platform is controlled within 1 cm. After the concrete pouring is completed, a professional care agent is used for smear and maintenance. This technology realizes the scientific control of the work of template slippage, system installation, and concrete pouring in the construction of the slider. ... Climbing construction process The outer frame adopts fully automatic attached lifting scaffolding for overall improvement, with fast construction speed, high safety performance and a large amount of turnover materials. https://archive.ph/0NVlV -
34
-
1
-
3
FBI Agents in Southeast Asia Implicated in Misconduct with Prostitutes
Thais are holiday gfs, we are your wives...Hahahahahaha -
34
-
-
Popular in The Pub
-
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now