Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Survey to seek better water access, alternatives to dam at Mae Wong

Featured Replies

Survey to seek better water access, alternatives to dam at Mae Wong
Wasu Vipoosanapat
The Nation

BANGKOK: -- THE Department of Water Resources (DWR) has begun a survey of water sources in Nakhon Sawan's Lad Yao district, to investigate canal and lake dredging to be implemented in 2016.

The survey should be ready in a week and details and budget submitted for the government to consider.

The survey was discussed during a meeting between DWR chief Jatuporn Buruphat and Sasin Chalermlarp, secretary general of the Seub Nakhasathien Foundation. The meeting was held to discuss the foundation's alternative water management plan - proposed to help locals get better access to water and to replace the controversial Mae Wong Dam plan.

Jatuporn pointed out many parts of the management plan were similar to the department's own scheme. He said the survey trip - which the foundation will also take part in - would also investigate the possibility of dredging Bueng Lom Lake, which would boost water storage capacity by 40 million cubic metres.

Jatuporn said the foundation's proposal could be included in the new water master management plan, a joint project by DWR and the Royal Irrigation Department (RID), set for release next month. He said this was not a slap in the face for RID, which initially backed the Mae Wong Dam, as his department oversees areas outside irrigated zones.

Sasin welcomed the DWR's move, which emphasises importance of other water management methods - rather than big dams, saying it was a better option for effective water management and would boost locals' water access.

"If Mae Wong Dam were built, it would take at least eight years to complete and wouldn't respond to the local communities' needs," he said.

Last week, Sasin camped outside the Office of Natural Resources and Environmental Policy and Planning to protest over a meeting to assess the Environmental Health Impact Assessment (EHIA) report for the dam. During the meeting, the Department of National Parks, Wildlife and Plant Conservation presented a statement calling for the dam to be cancelled.

Source: http://www.nationmultimedia.com/national/Survey-to-seek-better-water-access-alternatives-to-30248556.html

nationlogo.jpg
-- The Nation 2014-11-26

this is turning into a test of wills between the RID and the Dept Water Resources.

The RID seems determined to build dams wherever......rather than a scientific evaluation it seems dam-building with them is a policy or dogma.

"Jatuporn said the foundation's proposal could be included in the new water master management plan, a joint project by DWR and the Royal Irrigation Department (RID), set for release next month. He said this was not a slap in the face for RID, which initially backed the Mae Wong Dam, as his department oversees areas outside irrigated zones." - little bit of "kernel Jai" there.

​One can only hope that common sense prevails - if this dam is built it is unlikely it will benefit anyone but it will make Thailand an international pariah with regards to conservation.

"Sasin welcomed the DWR's move, which emphasises importance of other water management methods - rather than big dams, saying it was a better option for effective water management and would boost locals' water access.

"If Mae Wong Dam were built, it would take at least eight years to complete and wouldn't respond to the local communities' needs," he said." - Nation

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.