Jump to content

Outbound side of Thai-Belgian Bridge ready by 16th April


Recommended Posts

Posted

Outbound side of Thai-Belgian Bridge ready by 16th April

 

bb.jpg

 

BANGKOK, 10 April 2017 (NNT) - Bangkok is expected to re-open the outbound side of the Thai-Belgian Bridge next Sunday and will close the bridge’s inbound side the following day. 

The Thai-Belgian Bridge has been closed for repairs for 45 days following a fire that damaged its structure in February. The arson suspect has been arrested. 

The bridge's outbound side will reopen on 16th April as the repairs are now close to completion. The Bangkok Metropolitan Administration (BMA) will close the bridge’s inbound side leading to the Sam Yan area for repairs on 17th April. 

During this period, the Bangkok Metropolitan Administration (BMA) and metropolitan police have arranged for one-way traffic on the bridge’s inbound side between 6 a.m. and 9 a.m. and between 3 p.m. and 8 p.m. Two-way traffic is allowed in other, non-rush hours. 

The same traffic arrangement will be applied to the bridge’s outbound side after its reopening.

 
nnt_logo.jpg
-- nnt 2017-04-10

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...