Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Coal-fired power plant projects in Krabi and Thepa put off for 3 years

Featured Replies

Coal-fired power plant projects in Krabi and Thepa put off for 3 years

 

Siri-Chirapongpha.jpg

 

The Ministry of Energy has decided to put on hold two coal-fired power plant projects in Krabi and Thepa district of Songkhla for three years pending additional EHIA (environmental and health impacts assessment) and EIA (environmental impacts assessment) studies.

 

Energy Minister Siri Chirapongphan said Friday that the ministry would inform the cabinet its decision to put off the two controversial projects and, at the same time, propose its revised power development plan (PDP) for consideration in March.

 

He said that the postponement of implementation of the two coal-fired power plant projects for three years would not worse the electricity situation in the southern region which, currently, has to rely on an addition of 17 percent power supply or 460 megawatts from the other region to offset the shortage.

 

Full story: http://englishnews.thaipbs.or.th/coal-fired-power-plant-projects-krabi-thepa-put-off-3-years/

 

 
thaipbs_logo.jpg
-- © Copyright Thai PBS 2018-02-04
4 hours ago, rooster59 said:

Coal-fired power plant projects in Krabi and Thepa put off for 3 years

................but still before election.

If the EHIA & EIA had been done correctly in the first place then no delay would have been needed.  Even so 3 years seems a long time.  Is that an indication when the election will be held ?

7 hours ago, rooster59 said:

the postponement of implementation of the two coal-fired power plant projects for three years would not worse the electricity situation in the southern region

So much for the haste of the government and Egat to build these plants.

It was dishonest of both to be pushing for these plants without complete reviews for the sake of supposed urgency.

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.