Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

New 118 -121 junction and bridge

Featured Replies

As you may know work has started on the 118- 121 junction near Mae Kuang market planned for 2 years.  going to be a bit of a pain.

29749755_1897379060307410_1724261567527396708_o.jpg

29662822_1897379083640741_5000448992229861811_o.jpg

29665566_1897379110307405_4275469755895673121_o.jpg

29598009_1898205540224762_3762963860478859852_n.jpg

29573027_1898205493558100_8808252069334211345_n.jpg

29683230_1897374606974522_5195605764540715643_n.jpg

29598112_1897374593641190_3296209281534161702_n.jpg

29595457_1897374533641196_5724633504597768669_n.jpg

29597880_1897374530307863_7678786740653990473_n.jpg

29573296_1897374523641197_8343098003078828528_n.jpg

Looks rather neat though doesn't it? 

 

At least the 1367 HomePro road can take some of the strain away whilst they are doing the work I guess.  Shame they didn't budget to put underpasses on the 3rd ring road like they did on the second as it would have saved a lot of re-work time & expense.

Very strange design.  All those figure 8 merge points look very confusing for the average driver. The construction is going to be a major headache for those of us living off the 118 north of the 121.  I had no idea what was going on there.  Thanks sappersrest for all the details. 

It amazes me how they build rather semi-permanent buildings for the construction staff first and later tear them down, as they did at the 121/107 build.  They remained as derelict eyesores for some time. 

Sure hope someone has planned hiway signs with numbers.  But hey, i love all the neat colours on the maps.

1 hour ago, silverhawk_usa said:

Very strange design.  All those figure 8 merge points look very confusing for the average driver. The construction is going to be a major headache for those of us living off the 118 north of the 121.  I had no idea what was going on there.  Thanks sappersrest for all the details. 

It amazes me how they build rather semi-permanent buildings for the construction staff first and later tear them down, as they did at the 121/107 build.  They remained as derelict eyesores for some time. 

Have you seen how they do it in Bangkok? They build makeshift housing for hundreds of workers only a few meters away from the site (along the railroad tracks). They can literally roll out of bed and start work. It looks very dangerous to me. Partially built bridges with workers living/sleeping underneath them.

Any plans/timelines for when 121 will be all four lanes?

7 hours ago, JimGant said:

Any plans/timelines for when 121 will be all four lanes?

That should be a higher priority. 

That's the way I drive my kids to school, considering alternative routes, anyone know if the 11/1001 intersection is done yet? (I'm still on my escape-from-the-smoke trip)

 

1014 and 3013 to the East

1367 1001 to the West

Both will bypass the 118/121 junction

You can bet your boots traffic will increase on these routes

10 hours ago, junglechef said:

That's the way I drive my kids to school, considering alternative routes, anyone know if the 11/1001 intersection is done yet? (I'm still on my escape-from-the-smoke trip)

 

Yes, it's all finally finished. Big improvement to traffic flow. 

  • Author
On 4/20/2018 at 4:53 PM, JimGant said:

Any plans/timelines for when 121 will be all four lanes?

approximately 2 years

I travel many times on the 121 and 118 and have never seen a serious traffic problem at the junction there. Why do it?  anyway it might improve things a bit but now 3/4 years of Hell.

18 hours ago, canthai55 said:

1014 and 3013 to the East

1367 1001 to the West

Both will bypass the 118/121 junction

You can bet your boots traffic will increase on these routes

I think you meant 3017, and I agree traffic will increase.  The problem is that the small downtown of Doi Saket, at one end, and Borsang, at the other, will not be able to handle this influx of traffic.  Recently they installed a traffic light at the 118 turn off for Doi Saket.  Where traffic previously entered town (where I live) a couple cars at a time, they are now released in a line of traffic all at once when the traffic light changes.  This already causes a backup of traffic in town in front of the ever busy 7-11, Lotus Express, and banks. 

The same can be said for the small 2 lane road past all the tourist venues in Borsang.
I see some major headaches in the future. 

4 hours ago, BobBKK said:

I travel many times on the 121 and 118 and have never seen a serious traffic problem at the junction there. Why do it?  anyway it might improve things a bit but now 3/4 years of Hell.

One of the major causes, in my opinion, of the traffic problems in Chiang Mai is their failure to be pro-active and plan for the future.  Although I dread the inconvenience of this new construction, it is now a necessary evil and will be even more necessary for the future as traffic will not get any less.  The recent improvements to intersections on the north side of town should have been done years ago. 

So they just finish the underpass and bridge reworks down from Central Festival, which went for what? Three years or four?

...and now they will start another? 

Ya just can't win in this city.

19 hours ago, CMMCB said:

Yes, it's all finally finished. Big improvement to traffic flow. 

Almost....still some work going on at the bridge and of course down by MAYA, but yes the underpass is complete. Already some noticeable improvement.

21 hours ago, silverhawk_usa said:

One of the major causes, in my opinion, of the traffic problems in Chiang Mai is their failure to be pro-active and plan for the future.  Although I dread the inconvenience of this new construction, it is now a necessary evil and will be even more necessary for the future as traffic will not get any less.  The recent improvements to intersections on the north side of town should have been done years ago. 

Yes I probably agree and i'm probably not recognizing enough that 4/5pm it does get very bad at that junction.

Do you work ? If not - pick the time you travel.

Doi Saket to Superhiway easy after 1000. And before 1500 for the return trip.

  • Author

First two photos show before and after at  the traffic lights near Koolpuntvill 15 at Tha Rua market junction of 121 and 3013..

The third photo shows extent of complete works to 121

 

29594956_1897379436974039_542836193177860167_n.jpg

29573163_1897379416974041_8935987899453831912_n.jpg

29595563_1897372206974762_9201562068227529404_n.jpg

Create an account or sign in to comment

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.