Skip to content
View in the app

A better way to browse. Learn more.

Thailand News and Discussion Forum | ASEANNOW

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Shoddy construction likely to blame for collapse of Phuket gas station

Featured Replies

  • Popular Post

Why am I not surprised. I have seen probably the worst examples of building works, road works, new railway, simple things like air conditioning over the last couple of years in thailand. They don't seem to understand construction and implications of not doing things correctly 

  • Replies 61
  • Views 7.2k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

Posted Images

"Shoddy construction likely to blame for collapse of Phuket gas station"

Thank you, Sherlock.

1 hour ago, Old Croc said:

At least 4 of those killed were Thai.

Most definitely a Burmese  wind  then

  • Popular Post
17 minutes ago, dougiemac52 said:

Why am I not surprised. I have seen probably the worst examples of building works, road works, new railway, simple things like air conditioning over the last couple of years in thailand. They don't seem to understand construction and implications of not doing things correctly 

they understand exactly, get in get out as  fast as  possible and get the money and run...dont worry  about repeat customers 

16 hours ago, Happy Grumpy said:

Oh that's good, I wonder what they died from. 

 

 

 

 

squashed by falling debris perhaps??

 

  • Popular Post
2 hours ago, RichardColeman said:

Have rented 3 Thai built houses since moving to Thailand . 

 

1. Roof leaked and water ran down the kitchen wall past the electrics.

2. Roof leaked to the point of having to use a large bin bucket when it rained, sink came out of the wall.

3. Porch leaks,  terrible electrics, but otherwise so far so good. Though judging by the ceiling, roof has leaked inside previously.

 

Certainly Thais cannot build roofs !

 

Never buy house or condo built by a Thai unless overseeing it yourself !

Did someone mention roof's.

Unreal...

 

20170213_170437.jpg

  • Popular Post
20 hours ago, Oziex1 said:

Shoddy Construction, brought to you by corruption.

True. All the guys who post how they don't mind paying tea money don't care that they promote a corrupt culture that can result in incidents just like this. 

20 hours ago, Oziex1 said:

Shoddy Construction, brought to you by corruption.

More like cheap or lack of materials, virtually no supports in the roof.

Saving money costs lives in construction.... 

I'd take a close look at the architects design and match it to materials or build standard used then proportion blame!

 

8 minutes ago, ThaiWai said:

True. All the guys who post how they don't mind paying tea money don't care that they promote a corrupt culture that can result in incidents just like this. 

How correct you are

Feeding the beast makes it grow

The standard you walk past is the standard you encourage

 

  • Popular Post
1 minute ago, hotchilli said:

More like cheap or lack of materials, virtually no supports in the roof.

Saving money costs lives in construction.... 

I'd take a close look at the architects design and match it to materials or build standard used then proportion blame!

 

Architects design????, probably drawn up by the builder, and no basic engineering abilities, much less understanding of weights and stress  

What's so confusing about my simple post, Mr Hangmon?

We can't help you unless you talk about it. image.png

  • Popular Post

First move someone has to do is a stress test on a piece from that rubble. Then check the batch loading ticket for the batch time and compare it with the pour time. Life span of Concrete is only 90 minutes. Then it starts to set in redi-mix drum. Next check the quality of the sand. That is of high importance. I looked at the photo and surmised the rebar is too thin for that much weight to support. Also, how much cement powder per batched metre of concrete. 3-4-5/ 50 kg. bags per metre? Also, was a slump test done before pour? These are all critical in an investagation. And yes, I am an expert of cement as I was in the business for many years.

  • Popular Post
21 hours ago, Just1Voice said:

"Shoddy Construction. In other words Thai construction as normal. 

 

And nobody, owner/manager of building company, site engineer, site supervisors didn't notice that there were any issues/safety concerns?

 

Do any of them have any qualifications or the experience required for these positions?

 

Jail for 20 years for the lot of them and building company owner to pay massive compensation to families of the deceased. Nothing less will do. 

 

 

1 hour ago, hotchilli said:

More like cheap or lack of materials, virtually no supports in the roof.

Saving money costs lives in construction.... 

I'd take a close look at the architects design and match it to materials or build standard used then proportion blame!

 

I have a set of architects designed specs for a new house in Buriram. 

Surveyor reports. 

Draftsman etc.

They are starting to catch up in the regional areas. 

 

Now the builder says, "ok, we not use ". Too expensive this way...

Nobody checks....

 

Needless to say it's not happening. 

Especially 20 slump concrete and undersized reinforcing steel. 

 

TIT.

51 minutes ago, dallen52 said:

<snip>

 

Now the builder says, "ok, we not use ". Too expensive this way...

Nobody checks....

 

Needless to say it's not happening. 

Especially 20 slump concrete and undersized reinforcing steel. 

 

TIT.

 

I had that with our first building. Builder cut corners every which way. After 21 years I am surprised it's still standing. And drill holes go through like butter.

 

After that we build ourselves. Built strictly to approved plans. Ordered the best of material. Not so much more cost.

5 hours ago, legend49 said:

We all knew this outcome. What they fail to comprehend is what will they actually DO to prevent recurrences?

they will do as they always do, forget about it, just like they did after the Phoenix boat accident... nothing

1 hour ago, dallen52 said:

I have a set of architects designed specs for a new house in Buriram. 

Surveyor reports. 

Draftsman etc.

They are starting to catch up in the regional areas. 

 

Now the builder says, "ok, we not use ". Too expensive this way...

Nobody checks....

 

Needless to say it's not happening. 

Especially 20 slump concrete and undersized reinforcing steel. 

 

TIT.

I once had cpac do a  slump test, in the upside down  bucket, rodded to extreme, then pulled it  off and it went down to the floor in a puddle............he  looked up and said "OK"...needles to say I rejected it.

R.I.P trying to make a better life then this so sad 

23 hours ago, 4MyEgo said:

RIP Myanmar workers, no doubt it will be blamed on the wind once money exchanges hands.

And how do you know that ??  A stupid comment from the sidelines !

4 minutes ago, jaiyen said:

And how do you know that ??  A stupid comment from the sidelines !

Perhaps more stupid to have even bothered

20 hours ago, Happy Grumpy said:

Oh that's good, I wonder what they died from. 

 

 

 

 

Oh great! I hope that doesn't effect our insurance rates. Do you think they had insurance or a work permit to say the least !!!

20 hours ago, Happy Grumpy said:

Oh that's good, I wonder what they died from. 

 

 

 

 

being too flat to breath

3 hours ago, SinCityGr8One said:

First move someone has to do is a stress test on a piece from that rubble. Then check the batch loading ticket for the batch time and compare it with the pour time. Life span of Concrete is only 90 minutes. Then it starts to set in redi-mix drum. Next check the quality of the sand. That is of high importance. I looked at the photo and surmised the rebar is too thin for that much weight to support. Also, how much cement powder per batched metre of concrete. 3-4-5/ 50 kg. bags per metre? Also, was a slump test done before pour? These are all critical in an investagation. And yes, I am an expert of cement as I was in the business for many years.

I suppose that you don’t live in Thailand.

i don’t think that they ever do or did in the past the things what you suggested.

3 hours ago, dallen52 said:

I have a set of architects designed specs for a new house in Buriram. 

Surveyor reports. 

Draftsman etc.

They are starting to catch up in the regional areas. 

 

Now the builder says, "ok, we not use ". Too expensive this way...

Nobody checks....

 

Needless to say it's not happening. 

Especially 20 slump concrete and undersized reinforcing steel. 

 

TIT.

You have changed builder I am hoping

Wow.....how astute.

It was hardly the result of good construction. 

What a stupid statement

i have seen them work my friend sacked 3 builders because of shoddy work before he found someone half decent.this is everywhere in thailand,just unlucky for them it come down early or lucky before someone brought a place and then come down

Sorry for the guys that died, 

My Thai relative bought a 3 bedroom condo in a gated condo community, the

roof leaked for 3 years despite attempted repairs. Even the Thai public get the

same shoddy construction almost everywhere in  Thailand, seems like

corruption  has no bounds.

Geezer

I am very confused by this story, at first i thought they were erecting a precast wall, but now it looks like a floor slab, if so why were workers under a slab, what am i missing ? apart from a few grey cells.

47 minutes ago, brianthainess said:

I am very confused by this story, at first i thought they were erecting a precast wall, but now it looks like a floor slab, if so why were workers under a slab, what am i missing ? apart from a few grey cells.

 

Seems the precast slab was the roof of the planned gas station office. supposed 6m x 12 m (depend what report you read)  with only four pillars. Seems erected a week ago and now being fitted out by those workers. One story implies that construction ordered stop buy officials as there was concern about the structural support. But the builders ignored the order and carried on working.

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.